Toshiba G8000 Series installation manual Overview, External Wiring Diagram

Page 28

11. Wiring

11.1 Overview

Figure 11.1 shows the external wiring diagram of G8000 UPS. Wiring work is summarized below.

1)Power cable connection for AC input, Bypass Input, AC output, and DC input at terminal blocks or buses.

2)External breaker provision at AC input, Bypass Input, AC output, and DC input.

3)Earth ground wire at grounding electrode.

4)Control wire terminal TB1 (Battery cabinet and Bypass Breaker).

See corresponding section to each wiring term.

To TB1

Bypass 3φ4W

Bypass

Breaker

AC Input 3φ3W

Input

Breaker

< UPS >

 

 

 

Contactor + Thyristor

 

 

Bypass

Input

 

Contactor

 

 

Contactor

 

 

Rectifier

Inverter

Inverter

 

 

Contactor

Chopper

 

 

Charger

 

 

 

 

TB1

Output 3φ4W

Output

Breaker

Ground

Wire

DC input

Battery

To Bypass

Breaker

Breaker

< Battery Cabinet >

Figure 11.1 - External Wiring Diagram.

27

Image 28
Contents Document Number February Introduction Uninterruptible Power Supply Manual’s Purpose and Scope Contacting Toshiba’s Customer Support CenterGeneral Safety Instructions Important Safety Instructions Safety Precautions General Terms Do not remove the rear/side panels ProhibitedInstallation Precautions Avoid vibration or shock exceeding 0.5G to the UPSUPS Installation Environment Standard Do not install the UPS close to a water source Keep the UPS room cleanKeep the specified clearance around the UPS Connect ground wire to the earth ground terminal only MandatoryLocations of the Warning Labels 100/125 kVA Locations of the Warning Labels 150/180/225 kVA AC Input Grounding Electrode Terminal Contents Dimensions and Weight 100/125kVA UPS Exterior dimensions front & right side150/180/225kVA UPS Exterior dimensions front & right side 250/300kVA UPS Exterior dimensions front & right side Transportation Avoid vibration or shock exceeding 0.5 G to the UPSDo not expose the UPS to water Transportation by a craneAngle more than Transportation by a forklift Storage Installation Ensure that there is adequate working space aroundPoints to be observed UnpackingUPS Clearance Anchor bolts Anchor bolt tighteningExternal Wiring Diagram OverviewTerminal Blocks and Power Cables Phase 3-wire Phase 4-wireRecommended Cable Size and Tightening Torque for 125kVA UPS Recommended Cable Size and Tightening Torque for 180kVA UPS Phase 3-wire Phase 4-wire Recommended Cable Size and Tightening Torque for 250kVA UPS Ilsco External Breakers External Breaker RatingGrounding Wire 100~225kVA 250/300kVAControl Wires 10 External ConnectionsGrounding configuration Recommended configuration with input neutral groundedGrounding configuration without input neutral Recommended configuration with delta-inputGrounding configuration with corner-grounded delta-input 12 Grounding configuration with corner-grounded delta-input
Related manuals