Toshiba G8000 Series installation manual Anchor bolts, Anchor bolt tightening

Page 27

10.3 Anchor bolts

Tighten the anchor bolts to secure the UPS on the floor. Tightening detail is shown in Figure 10.2.

Anchor bolts of 12mm (1/2”) diameter are to be used, clearance holes of 16mm (5/8”) diameter are provided in the UPS base.

4 of 16mm-diameter

4 screw holes

(5/8”) screw holes

(Side View)

Figure 10.2 -

Anchor bolt tightening

Anchor Bolt

< 100~225kVA >

Back

4x 12mm-Dia.(1/2”)

Front

 

< 250/300kVA >

550mm

8 x 12mm-Dia.(1/2”)

(21” 21/32)

 

650mm

(25” 19/32)

100/125kVA: 1,050mm (41” 11/32)

 

 

 

 

 

150/180/225kVA: 1,170mm (46” 1/16)

575mm

 

564mm

575mm

 

(22” 5/8)

 

(22” 3/16)

(22” 5/8)

Figure 10.3 - Hole locations and dimensions for anchor bolts.

26

Image 27
Contents Document Number February Introduction Uninterruptible Power Supply Contacting Toshiba’s Customer Support Center Manual’s Purpose and ScopeGeneral Safety Instructions Important Safety Instructions Safety Precautions Prohibited General Terms Do not remove the rear/side panelsAvoid vibration or shock exceeding 0.5G to the UPS Installation PrecautionsUPS Installation Environment Standard Keep the UPS room clean Do not install the UPS close to a water sourceKeep the specified clearance around the UPS Mandatory Connect ground wire to the earth ground terminal onlyLocations of the Warning Labels 100/125 kVA Locations of the Warning Labels 150/180/225 kVA AC Input Grounding Electrode Terminal Contents 100/125kVA UPS Exterior dimensions front & right side Dimensions and Weight150/180/225kVA UPS Exterior dimensions front & right side 250/300kVA UPS Exterior dimensions front & right side Transportation by a crane TransportationAvoid vibration or shock exceeding 0.5 G to the UPS Do not expose the UPS to waterAngle more than Transportation by a forklift Storage Ensure that there is adequate working space around InstallationUnpacking Points to be observedUPS Clearance Anchor bolt tightening Anchor boltsOverview External Wiring DiagramPhase 3-wire Phase 4-wire Terminal Blocks and Power CablesRecommended Cable Size and Tightening Torque for 125kVA UPS Recommended Cable Size and Tightening Torque for 180kVA UPS Phase 3-wire Phase 4-wire Recommended Cable Size and Tightening Torque for 250kVA UPS Ilsco External Breaker Rating External Breakers100~225kVA 250/300kVA Grounding Wire10 External Connections Control WiresRecommended configuration with input neutral grounded Grounding configurationRecommended configuration with delta-input Grounding configuration without input neutral12 Grounding configuration with corner-grounded delta-input Grounding configuration with corner-grounded delta-input
Related manuals
Manual 63 pages 16.31 Kb