5.Installation Precautions

Personnel

WARNING

Please have a certified/qualified electrician install the UPS per local and/or national electric codes.

UPS faults or improper operation may occur if not installed properly per codes and the installation manual.

MANDATORY

Transportation/Unpacking

CAUTION

Do not transport, move, store, or place the UPS on its side.

Excessive force applied from heavy objects inside may damage the UPS.

PROHIBITED

Avoid vibration or shock exceeding 0.5G to the UPS.

Failing to observe this precaution may cause damage to the UPS.

PROHIBITED

When unpacking the unit, do not give a direct shock or impact to the UPS with a hammer or disassembling tool.

It may cause damage to the UPS.

PROHIBITED

8

Image 9
Contents Document Number February Introduction Uninterruptible Power Supply Contacting Toshiba’s Customer Support Center Manual’s Purpose and ScopeGeneral Safety Instructions Important Safety Instructions Safety Precautions Prohibited General Terms Do not remove the rear/side panelsAvoid vibration or shock exceeding 0.5G to the UPS Installation PrecautionsUPS Installation Environment Standard Keep the UPS room clean Do not install the UPS close to a water sourceKeep the specified clearance around the UPS Mandatory Connect ground wire to the earth ground terminal onlyLocations of the Warning Labels 100/125 kVA Locations of the Warning Labels 150/180/225 kVA AC Input Grounding Electrode Terminal Contents 100/125kVA UPS Exterior dimensions front & right side Dimensions and Weight150/180/225kVA UPS Exterior dimensions front & right side 250/300kVA UPS Exterior dimensions front & right side Avoid vibration or shock exceeding 0.5 G to the UPS TransportationDo not expose the UPS to water Transportation by a craneAngle more than Transportation by a forklift Storage Ensure that there is adequate working space around InstallationUnpacking Points to be observedUPS Clearance Anchor bolt tightening Anchor boltsOverview External Wiring DiagramPhase 3-wire Phase 4-wire Terminal Blocks and Power CablesRecommended Cable Size and Tightening Torque for 125kVA UPS Recommended Cable Size and Tightening Torque for 180kVA UPS Phase 3-wire Phase 4-wire Recommended Cable Size and Tightening Torque for 250kVA UPS Ilsco External Breaker Rating External Breakers100~225kVA 250/300kVA Grounding Wire10 External Connections Control WiresRecommended configuration with input neutral grounded Grounding configurationRecommended configuration with delta-input Grounding configuration without input neutral12 Grounding configuration with corner-grounded delta-input Grounding configuration with corner-grounded delta-input