EXCEL 10 W7761A INPUT/OUTPUT DEVICE
APPLICATION STEPS
Overview
The seven application steps shown in Table 3 are planning considerations for engineering an Excel 10 W7761 Remote Input/Output Device. These steps are guidelines intended to aid understanding of the product I/O options, bus arrangement choices and the Excel 10 W7761A Devices role in the overall EXCEL 5000® System architecture.
Table 3 . Application Steps.
Step No. | Description |
|
|
1 | Plan The System |
|
|
2 | Determine Other Bus Devices Required |
|
|
3 | Lay Out Communication and Power Wiring |
|
|
4 | Prepare Wiring Diagrams |
|
|
5 | Order Equipment |
|
|
6 | Configure Devices |
|
|
7 | Troubleshooting |
|
|
Step 1. Plan The System
Plan the use of the W7761A Devices according to the job requirements. Determine the location, functionality and sensor or actuator usage. Verify the sales estimate of the number of W7761A Devices and the number and type of output actuators and other required accessories.
When planning the system layout, consider potential expansion possibilities to allow for future growth. Planning is very
important to be prepared for adding HVAC systems and controllers in future projects.
terminal to have access to the
T7770A,B,C,D Wall
566(,327$&%/(312/$5746/7$$(3257%860-'
Fig. 8. Connecting the portable operator terminal to the E-Bus.
The FTT communication loop,
The application engineer must review the Direct Digital Control (DDC) job requirements. This includes the Sequences of Operation for the Excel 10 controllers, and for the system as a whole. Usually there are variables that must be passed between the W7750 (CVAHU), Q7750A Zone Manager, W7761 (RIO), and other Excel 10 controller(s), or central plant controller(s) that are required for optimum
17 |