Upgrade Procedures
2.The System Manager should perform the necessary backups before starting the upgrade procedure.
N O T E :
If you are also upgrading to UNIX 3.2.2, you must backup the system. See the Backing Up Administrative Files and the Backing Up Speech Files sections in this chapter. You will then use the information in Chapter 3, Software Installation. You restore the files Immediately after loading the Integrated Voice Power System Software.
a.Use the Backing Up Administrative Files procedure found later in this chapter to back up all files in the following directories:
/ u s r / v m d b / u s r / o c d b
/ a v p / d a t a
/g e n d b
b. Use the Backing up Speech Files procedure found later in this chapter to backup the following speech files:
talkfile 46 phrase all t a l k f i l e 4 7 p h r a s e a l l
3.Remove the switch integration patch, the AUDIX Voice Power Application Software patch, and the Integrated Voice Power System Software patch (if any are present) in that order by following this procedure for each patch:
a.Log in as root (if not already logged in).
b.At the # prompt, type removepkg and press (Enter). A list of available packages appears.
c.Select the number to remove and press (Enter). The system displays a confirmation request.
Confirm.