Section 5: Maintenance
5.1 Maintenance Intervals
| Check warning signs on equipment for good legibility |
Daily: | and completeness. |
|
|
Weekly: | Check function of the on/off Switch. |
|
|
Every 3 | Check scraper in dosing station DD/DT. |
months: |
|
| Check all electrical and mechanical connections for |
Every 6 | tight fit. |
months: | Check adjustment of the level probes (optional). |
| |
|
|
Annually: | Check dosing disc in dosing station DD/DT. |
|
|
Each time | Clean the dosing station. |
after | Check scraper. |
material | Check dosing disc. |
Is changed: |
5.2 Removing the Scraper |
| ||
Removing the scraper | Figure | ||
1. | Empty the dosing station. | ||
| |||
2. | Open the profile clamp |
| |
| (B) on the dosing hopper. |
| |
3. | Remove the dosing hopper |
| |
| from the dosing unit. |
| |
4. | Open the safety screws at |
| |
| the |
| |
5. | Open the |
| |
| fasteners on the dosing |
| |
| motor. |
|
Digital Dosing Units | 35 |