Configuring a Secondary Redundant PLC
This section describes the steps for configuration of a Secondary PLC. The programmer for Logicmaster
Create a new folder for the Secondary PLC system. Copy the data from the Primary PLC system to the Secondary PLC system folder. This process will save time since you will not need to
This example shows how to change the Primary PLC redundancy configuration described on the previous pages to a Secondary PLC redundancy.
Enter the I/O Configuration software by pressing the I/O softkey (F1). The configuration for rack 0 appears as shown below (note that this is the configuration that you had selected for the Primary PLC)