| 1 |
|
|
| 65 |
| 67 | 5 |
|
| |
69 | 66 |
|
|
| |
3/8 X 61m | 54 |
|
3/8 X 43mm 52 | 4 | |
W/LOCTITE |
| |
|
| |
FIGURE 28 |
|
|
STEP 28:
•SECURELY assemble the PRESS ARM (4) to the PIVOTARM (5) using two RH CAPS (69), two 3/8 X 43mm BOLTS W/LOCTITE (52), two 3/8” SAE WASHERS (66) and two 3/8” RH WASHERS (67) as shown in FIGURE 28.
•SECURELY assemble the COUNTERBALANCE (1) to the PIVOTARM (5) using four RH CAPS (69), two 3/8 X 61mm BOLTS (54), four 3/8” SAE WASHERS (66), four 3/8” RH WASHERS (67) and two 3/8” LOW HEIGHT LOCK NUTS (65) as shown in FIGURE 28.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0 | 1/2 |
| 1 | 1/2 | 2 |
| 1/2 | 3 |
| 1/2 | 4 |
| 1/2 | 5 |
| 1/2 | 6 | ||||||||||||||
10 |
| 20 | 30 | 40 | 50 | 60 |
|
| 70 |
| 80 | 90 | 100 |
| 110 |
|
| 120 |
| 130 | 140 | 150 |
| ||||||||
|
|
|
|
|
|
|
|
|
|
25