
| 66 | 49 3/8 X 25mm |
|
|
|
|
|
| |
67 |
| 69 |
|
|
|
|
|
| |
76 |
|
|
|
|
75 |
|
|
|
|
65 |
|
|
|
|
|
|
|
| 10 |
|
| 67 |
|
|
|
| 66 |
|
|
|
| 3/8 X 90mm | 58 | 69 |
|
|
| ||
FIGURE 33 |
|
|
|
|
STEP 33:
•SECURELY assemble the STORAGE UPRIGHT (75) to the TOWER BASE (10) using four RH CAPS (69), two 3/8 X 90mm BOLTS (58), four 3/8” SAE WASHERS (66), four 3/8” RH WASHERS (67) and two 3/8” LOW HEIGHT LOCK NUTS (65) as shown in FIGURE33.
•SECURELYassemble the STORAGE PEGS (76) to the STORAGE UPRIGHT (75) using two RH CAPS (69), two 3/8 X 25mm BOLTS (49), two 3/8” SAE WASHERS (66) and two 3/8” RH WASHERS (67) as shown in FIGURE 33.
•Please refer to the LEG PRESS PARTS LIST to complete the
assembly of the LEG PRESS.
30