93 |
94 |
10 |
105 |
106 |
99 3/8 X 43mm |
FIGURE 44 |
STEP 44:
•Route the LEG PRESS CABLE (93) under the weight stack and through the bracket on the TOWER BASE (10) and assemble one
37
93 |
94 |
10 |
105 |
106 |
99 3/8 X 43mm |
FIGURE 44 |
•Route the LEG PRESS CABLE (93) under the weight stack and through the bracket on the TOWER BASE (10) and assemble one
37