| | FIGURE 29 |
| | 69 |
| | 26 |
| | 5 |
| | 4 |
28 | | 73 |
68 BLACK | |
| 65 |
| |
3/8 X 70mm | 56 | |
| 8 | |
| 67 | 46 |
| 66 | 26 |
| |
| 3/8 X 67mm 55 | |
| 69 | 54 3/8 X 61mm |
| |
STEP 29:
•Route the MULTI PRESS CABLE (73) through the MULTI PRESS FRAME (8) and assemble one 4-1/2” PULLEY (26) to the FRAME (8) using four RH CAPS (69), one 3/8 X 67mm BOLT (55), one 3/8 X 61mm BOLT (54), four 3/8” SAE WASHERS (66), four 3/8” RH WASHERS (67), two 3/8 X 1/2” FLANGE SPACERS (46) and two 3/8” LOW HEIGHT LOCK NUTS (65) as shown in FIG- URE29.
•Route the MULTI PRESS CABLE (73) through the MULTI PRESS FRAME (8) and PIVOT ARM (5) and assemble one 4-1/2” PULLEY (26) to the PIVOT ARM (5) using one BLACK RH CAP (68), one RH CAP (69), one 3/8 X 70mm BOLT (56), two 3/8” SAE WASHERS (66), two 3/8” RH WASHERS (67), one 2-7/8” X 2-1/4” CABLE CLIP (28), two 3/8 X 1/2” FLANGE SPACERS (46) and one 3/8” LOW HEIGHT LOCK NUT (65) as shown in FIGURE 29.
26