| 9 |
| REMOVE CAP BEFORE ASSEMBLY! |
| 67 |
65 | 66 |
| 59 3/8 X 97mm |
| 69 |
| 10 |
FIGURE 3 |
|
STEP 3:
•LOOSELY assemble the TOWER UPRIGHT (9) to the TOWER BASE (10) using four RH CAPS (69), two 3/8 X 97mm BOLTS (59), four 3/8” SAE WASHERS (66), four 3/8” RH WASHERS (67) and two 3/8” LOW HEIGHT LOCK NUTS (65) as shown in FIGURE 3.
(NOTE:REPLACECAPAFTERASSEMBLY.)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0 | 1/2 |
| 1 | 1/2 | 2 | 1/2 | 3 |
| 1/2 | 4 |
| 1/2 |
| 5 | 1/2 | 6 | |||||||||||||
10 |
| 20 | 30 | 40 | 50 | 60 |
| 70 |
| 80 | 90 | 100 |
| 110 | 120 | 130 | 140 | 150 |
| ||||||||||
|
|
|
|
|
|
8