65 |
85 |
67 |
66 |
104 3/8 X 117mm |
69 |
10 |
FIGURE 2 |
STEP 2:
•LOOSELY assemble the LEG PRESS FRAME (85) to the TOWER BASE (10) using four RH CAPS (69), two 3/8 X 117mm BOLTS (104), four 3/8” SAE WASHERS (66), four 3/8” RH WASHERS (67) and two 3/8” LOW HEIGHT LOCK NUTS (65) as shown in FIG- URE 2. (NOTE: The two 3/8 X 117mm BOLTS (104) for this step are in the LEG PRESS hardware bag.)
7