Centurion CP72SR5 installation manual Gearbox Mounting Down Details

Page 12

 

54

54

53

 

52

7

mm

51

GEARBOX MOUNTING DOWN DETAILS

-Leave at least 7mm clearance between the lower gearbox nuts 52 and the baseplate to allow for later adjustment.

-Gearbox MUST be firmly located between top & bottom nuts and washers

54 as shown at 51 . Use spring washer 53 to lock top nut in place.

-Slide gearbox forwards or backwards to give ±8mm clearance between front of pinion and edge of gate.

10

Image 12
Contents Sliding Gate Automation Page Oil Specifications Grade 75W90 Qty 75ml Major Components Typical D5 ShownStart kgF RUN kgF Gate Mass kg 300 500 ANTI-LIFT Brackets Duty Cycle Curves Recommended Installation and Cable Thickness REQUIREMENTS† Mechanical Mounting Details Option 1 Bolt down onto concrete plinthPage Option 2 Set into concrete plinth Provision for Cables Gearbox Mounting Down Details Mounting Rack Useful TIP200mm Installing Chain Drive Systems Setting Mechanical Clutch A5 only Ensure fan has stopped turningMounting Configuration For Steel Rack Mounting of Gate SensorPower Wiring see page 15 for Signal Wiring Removable ConnectorsSignal Wiring CP80 and CP81 Recommended Lightning Protection Commissioning Block Diagram Setting Motor Direction Gate Closes Towards Left Above Black Blue RED Towards RightSelecting Programme Mode Setting Gate Limits A5 onlySetting Gate Limits Start Automated Gate Limits RoutineD3/D5 Motor Automatic SET-UP Exit Gate Limits Routine D3/D5 only Start Manual Gate Limits RoutineAlign Origin Switch A5 Motor Manual SET-UPExit Gate Limits Routine A5 only Functions SelectFactory Defaults Highlighted Timer and Counter Setting Main Unit Menu Measure Procedure to Programme Controller Back to Factory Settings Fault Finders Guide D3 / D5 OperatorsGate Opens to Pedestrian and Closes Page Centurion