A5 MOTOR MANUAL SET-UP
STEP 1 ALIGN ORIGIN SWITCH
- Start with gate fully closed.
- Push gate open (origin marker must have moved well past origin switch).
- Push gate closed again.
STEP 2 - ENSURE PCB IS IN PROGRAMME
MODE (refer procedure page 21)
STEP 3 - SET LIMITS
- Press TEST pushbutton until LED L1 flashes once and release.
-L1 will continue to flash once and L2 will go out.
-Press TEST pushbutton until STATUS LED
comes ON and release (check that L1, L2 & STATUS are OFF)
STEP 4
- Push gate to fully “OPEN” position and do not allow gate to reverse.
- Press TEST pushbutton until STATUS LED comes ON and release.
STEP 5
- Push gate to fully “CLOSED” position hard up against endstop and do not allow gate to reverse.
- Press TEST pushbutton until STATUS LED comes ON and release.
|
|
|
| STEP 6 |
|
|
| “PED” | - Push gate to “PEDESTRIAN” open position. |
|
|
| ||
|
|
| - Press TEST pushbutton until STATUS LED | |
|
|
|
| comes ON and release. If STATUS LED |
|
|
|
| does not come ON, increase pedestrian |
|
|
|
| |
|
|
|
| opening until it does. |
26