Centurion CP72SR5 installation manual Recommended Lightning Protection

Page 20

31

34

50

E N L

220V AC

LNE

INPUT

220V AC OUTPUT

TO CP80/CP81

49

PCB "DC IN”

 

43

48

RECOMMENDED LIGHTNING PROTECTION

-For optimum lightning protection ensure earth cable from charger/PSU unit 34 is adequately earthed.

- Use ring lug 49 to bond to baseplate mounting stud.

- For additional protection bond baseplate 43 to earth spike 48 .

-In event of damage to charger/PSU unit 34 disconnect quick release link 50 and push-on connector on controller.

18

Image 20
Contents Sliding Gate Automation Page Oil Specifications Grade 75W90 Qty 75ml Major Components Typical D5 ShownStart kgF RUN kgF Gate Mass kg 300 500 ANTI-LIFT Brackets Duty Cycle Curves Recommended Installation and Cable Thickness REQUIREMENTS† Mechanical Mounting Details Option 1 Bolt down onto concrete plinthPage Option 2 Set into concrete plinth Provision for Cables Gearbox Mounting Down Details Mounting Rack Useful TIP200mm Installing Chain Drive Systems Setting Mechanical Clutch A5 only Ensure fan has stopped turningMounting Configuration For Steel Rack Mounting of Gate SensorPower Wiring see page 15 for Signal Wiring Removable ConnectorsSignal Wiring CP80 and CP81 Recommended Lightning Protection Commissioning Block Diagram Setting Motor Direction Gate Closes Towards Left Above Black Blue RED Towards RightSelecting Programme Mode Setting Gate Limits A5 onlySetting Gate Limits Start Automated Gate Limits RoutineD3/D5 Motor Automatic SET-UP Exit Gate Limits Routine D3/D5 only Start Manual Gate Limits RoutineAlign Origin Switch A5 Motor Manual SET-UPExit Gate Limits Routine A5 only Functions SelectFactory Defaults Highlighted Timer and Counter Setting Main Unit Menu Measure Procedure to Programme Controller Back to Factory Settings Fault Finders Guide D3 / D5 OperatorsGate Opens to Pedestrian and Closes Page Centurion