Centurion
CP72SR5
installation manual
Install
Commissioning Block Diagram
Factory Defaults Highlighted
Timer and Counter Setting
Signal Wiring CP80 and CP81
Removable Connectors
Setting Motor Direction
Align Origin Switch
Selecting Programme Mode
Page 35
Page 34
Page 36
Image 35
Page 34
Page 36
Contents
Sliding Gate Automation
Page
Major Components Typical D5 Shown
Oil Specifications Grade 75W90 Qty 75ml
Start kgF RUN kgF Gate Mass kg 300 500
ANTI-LIFT Brackets
Duty Cycle Curves
Recommended Installation and Cable Thickness REQUIREMENTS†
Option 1 Bolt down onto concrete plinth
Mechanical Mounting Details
Page
Option 2 Set into concrete plinth
Provision for Cables
Gearbox Mounting Down Details
Useful TIP
Mounting Rack
200mm
Installing Chain Drive Systems
Ensure fan has stopped turning
Setting Mechanical Clutch A5 only
Mounting of Gate Sensor
Mounting Configuration For Steel Rack
Removable Connectors
Power Wiring see page 15 for Signal Wiring
Signal Wiring CP80 and CP81
Recommended Lightning Protection
Commissioning Block Diagram
Gate Closes Towards Left Above Black Blue RED Towards Right
Setting Motor Direction
Selecting Programme Mode
A5 only
Setting Gate Limits
Start Automated Gate Limits Routine
Setting Gate Limits
D3/D5 Motor Automatic SET-UP
Start Manual Gate Limits Routine
Exit Gate Limits Routine D3/D5 only
A5 Motor Manual SET-UP
Align Origin Switch
Functions Select
Exit Gate Limits Routine A5 only
Factory Defaults Highlighted
Timer and Counter Setting
Main Unit Menu Measure
Fault Finders Guide D3 / D5 Operators
Procedure to Programme Controller Back to Factory Settings
Gate Opens to Pedestrian and Closes