Heat Controller HTD, HTV, HTH manual Table of Contents

Page 2

Installation, Operation & Maintenance

HTV/HTD/HTH SERIES

Heat Controller, Inc.

Model Breakdown

Model Nomenclature – Two Stage Geothermal Heat Pump

 

1

 

2

 

 

3

 

 

4

5

6

7

 

 

9

10

 

11

 

12

 

 

13

 

 

14

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HT

 

V

 

0 2 4

 

C

 

1

 

C

 

0

 

1

 

A

 

L

 

K

 

 

 

 

 

 

 

 

 

 

 

Series

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Supply Air Flow &

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Motor Configuration

 

 

 

 

HT = Heat Controller Two Stage

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Supply

 

Configuration

 

Motor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

K

 

Top

 

HTV

 

ECM

 

 

 

Configuration

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N

 

Down

 

HTD

 

ECM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

P

 

Back

 

HTH

 

ECM

 

 

 

V = Vertical Up Flow

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

W

 

Straight

 

HTH

 

ECM

 

 

 

H = Horizontal

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

D = Vertical Down Flow

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Unit Size

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

024

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Return Air Flow Configuration

 

 

 

 

 

 

036

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

048

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L = Left Return

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

R = Right Return

 

 

 

 

 

 

 

 

 

 

060

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

070

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Revision Level

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Heat Exchanger Options

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A = Copper Water Coil, Coated Air Coil

 

 

 

 

 

 

 

 

 

 

B = Efficiency Upgrade

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

J = Copro-Nickel Water Coil, Coated Air Coil

 

 

 

 

 

 

 

 

 

 

C = Microchannel Air Coil on 036

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Voltage

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Water Circuit Options

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1 = 208-230/30/1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1 = HWG w/Internal Pump

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0 = None

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Controls

 

 

 

 

 

 

 

 

 

 

Cabinet

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C = CXM

 

 

 

 

 

 

 

 

 

 

0 = Residential

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TABLE OF CONTENTS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Model Nomenclature

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

Blower Data

 

 

 

 

 

 

 

 

 

 

 

 

 

 

26

Storage

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

CXM Controls

 

 

 

 

 

 

 

 

 

 

 

 

 

 

27

Pre-Installation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

Safety Features – CXM Control

..................

 

28-30

Horizontal Installation

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

Unit Commissioning

 

 

 

 

 

 

 

Field Conversion of Air Discharge

 

 

 

 

 

 

7

 

And Operating Conditions

 

 

 

31

Duct System Installation

 

 

 

 

 

 

 

 

 

 

 

 

 

8

 

Unit Start-Up and Operating Conditions

...........32

Condensate Piping Installation

 

 

 

 

 

 

 

 

8

 

Unit Start-Up Procedure

 

 

 

32

Vertical Installation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9-10

 

Coax Pressure Drop Tables

 

34

Water Connection Installation

 

 

 

 

 

 

 

 

 

 

11

 

Unit Operating Conditions

 

 

 

35-36

Ground Loop Applications

 

 

 

 

 

 

 

 

 

 

11-12

 

Performance Data

......................................

 

 

 

 

 

 

 

 

 

37-41

Open Loop - Ground Water Systems

13

 

Preventive Maintenance

 

 

 

42

Water Quality Standards

..................................

 

 

 

 

 

 

 

 

 

 

 

 

 

15

 

Troubleshooting

 

 

 

 

 

 

 

 

 

 

43

Hot Water Generator

 

 

 

 

 

 

 

 

 

 

 

 

 

16-18

 

CXM Process Flow Chart

 

 

 

44

Electrical - Line Voltage

 

 

 

 

 

 

 

 

 

 

 

 

 

19-20

 

Functional & Performance

 

 

 

 

 

 

 

Electrical - Low Voltage Wiring

 

 

 

 

 

 

 

 

 

21-22

 

Troubleshooting

 

 

 

 

 

 

 

 

 

 

45-46

 

 

 

 

 

 

 

 

 

Troubleshooting Form

 

 

 

47

Accessory Connections

 

 

 

 

 

 

 

 

 

 

 

 

 

22

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Refrigerant Circuit Diagram

 

47

Electrical - Thermostat Wiring

 

 

 

 

 

 

 

 

 

 

23

 

 

 

 

 

 

 

 

 

 

 

 

 

Revision History

 

 

 

 

 

 

 

 

 

 

48

ECM Blower Control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

24-25

 

 

 

 

 

 

 

 

 

 

 

...................................

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

Image 2
Contents HTV/HTD/HTH Series Two-Stage Geothermal Heat Pumps To 6 Tons Table of Contents Safety General Information Horizontal Unit Location Hanger BracketHorizontal Installation Typical Horizontal Unit InstallationField Conversion of Air Discharge Side to Back Discharge Conversionರ3HU RRW Duct System InstallationCondensate Piping Horizontal Units Vertical Installation Vertical Unit LocationReturn Using a threaded pipe or similar device to clearMay ease final drain line installation Air InletExternal Flow Controller Mounting Water Connection InstallationPiping Installation Flushing the Earth LoopAntifreeze Fluid Volume gal liters per 100’ 30 meters PipeGround-Loop Heat Pump Applications Water Quality Standards Antifreeze Percentages by VolumeOpen Loop Ground Water Systems Pressure Tank and PumpGround-Water Heat Pump Applications Typical Open Loop/Well ApplicationWater Quality Standards Typical HWG Installation Hot Water GeneratorControl Logic Error InstallationHigh Water Temperature 160ºF ÅashesHWG Water Piping Water Tank PreparationInitial Start-Up Water Tank RefillElectrical Line Voltage HT Series Electrical DataHWG Wiring Split Units Only General Line Voltage WiringPower Connection Electrical Line VoltageLow Water Temperature Cutout Selection Electrical Low Voltage WiringLow voltage Äeld wiring for units with ECM fan Thermostat ConnectionsAccessory Connections Two-stage UnitsFault LED Electrical Thermostat WiringThermostat Installation ATM21U01ECM Blower Control ECM Board Tap Settings HT UnitsHT Series ECM Blower Performance Data CXM Controls Safety Features CXM Control Diagnostic FeaturesECM fan PSC fan Unit Operation Stat signalCXM Control Start-up Operation CXM Thermostat Details Nominal resistance at various temperaturesThermostat Signals Not compatible with the CXMCommissioning Conditions Unit Commissioning And Operating ConditionsOperating Limits Voltage utilization range complies with Ahri StandardUnit Start-Up and Operating Conditions Before Powering SYSTEM, please check the followingUnit Start-up Procedure Unit and System CheckoutUnit Start-Up Procedure HT Coax Water Pressure Drop Water Temperature Change Through Heat ExchangerUnit Operating Conditions Antifreeze Correction TableHT Series Typical Unit Operating Pressures and Temperatures PsigGPM Performance Data HT 024 Full Load Cooling EAT 80/67FPerformance Data HT 036 Full Load Performance Data HT 048 Full Load Performance Data HT 060 Full Load Performance Data HT 070 Full Load Preventive Maintenance Troubleshooting CXM Functional Troubleshooting Flow Chart CXM Process Flow ChartFunctional Troubleshooting Main power problemsPerformance Troubleshooting Performance Troubleshooting Htg Clg Possible Cause SolutionTroubleshooting Form +&$97B00