Heat Controller HTH, HTV, HTD manual Unit Commissioning And Operating Conditions, Operating Limits

Page 31

Installation, Operation & Maintenance

HTV/HTD/HTH SERIES

Heat Controller, Inc.

Unit Commissioning And Operating Conditions

Operating Limits

Environment – Units are designed for indoor installation only. Never install units in areas subject to freezing or where humidity levels could cause cabinet condensation (such as unconditioned spaces subject to 100% outside air).

Power Supply – A voltage variation of +/– 10% of nameplate utilization voltage is acceptable.

Determination of operating limits is dependent primarily upon three factors: 1) return air temperature. 2) water temperature, and 3) ambient temperature. When any one of these factors is at minimum or maximum levels, the other two factors should be at normal levels to insure proper unit operation. Extreme variations in temperature and humidity and/or corrosive water or air will adversely affect unit performance, reliability, and service life. Consult Table 8a for operating limits.

Table 8a: Building Operating Limits

 

Limits

 

 

TTUnitHT

 

 

 

pOperatingLimits

 

Cooling

 

Heating

 

 

 

Cooling

 

 

Air mLimits

 

 

 

 

 

 

 

Min. ambient air, DB

 

45ºF [7ºC]

 

39ºF [4ºC]

 

mbient air, DB

 

45ºF [7ºC]

39ºF [4ºC]

 

Rated ambient air, DB

 

80.6ºF [27ºC]

68ºF [20ºC]

 

ambient air, DB

 

80.6ºF [27ºC]

68ºF [20ºC]

 

Max. ambient air, DB

 

130ºF [54ºC]

85ºF [29ºC]

 

mbient air, DB

 

130ºF [54ºC]

85ºF [29ºC]

 

Min. entering air, DB/WB

 

65/45ºF [18/7ºC]

50ºF [10ºC]

 

tering air, DB/WB

 

60/45ºF [16/7ºC]

40ºF [4.4ºC]

 

entering air, DB/WB

 

70/50ºF Reheat

68ºF [20ºC]

 

 

80.6/66.2ºF [27/19ºC]

 

Rated entering air, DB/WB

 

80.6/66.2ºF [27/19ºC]

68ºF [20ºC]

 

ntering air, DB/WB

 

100/75ºF [38/24ºC]

80ºF [27ºC]

 

Max. entering air, DB/WB

 

100/75ºF [38/24ºC]

80ºF [27ºC]

 

Limits

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Water Limits

 

30ºF [-1ºC]

20ºF [-6.7ºC]

 

tering water

 

 

Min. entering water

 

20ºF [-6.7ºC]

20ºF [-6.7ºC]

 

entering water

 

50-110ºF [10-43ºC]

30-70ºF [-1 to

 

Normal entering water

 

50-110ºF [10-43ºC]

30-70ºF [-1 to 21ºC]

 

Maxntering. enteringwaterwater

 

120ºF120ºF[49ºC][49ºC]

120ºF90ºF [32ºC][49ºC]

 

NormalWaterWaterFlowFlow

 

1.15.5toto3.30.0gpm/ /ton

 

 

 

[1[1.6.6toto3.32.2l/ml/mperkW]

 

 

 

 

 

 

 

 

 

 

 

Commissioning Conditions

Consult Table 8b for the particular model. Starting conditions vary depending upon model and are based upon the following notes:

Notes:

1.Conditions in Table 8b are not normal or continuous operating conditions. Minimum/maximum limits are start-up conditions to bring the building space up to occupancy temperatures. Units are not designed to operate under these conditions on a regular basis.

2.Voltage utilization range complies with AHRI Standard 110.

Table 8b: Building Commissioning Limits

Commissioning Limits

UnitHT

Cooling

Heating

 

 

Air Limits

 

 

Min. ambient air, DB

45ºF [7ºC]

39ºF [4ºC]

Rated ambient air, DB

80.6ºF [27ºC]

68ºF [20ºC]

Max. ambient air, DB

130ºF [54ºC]

85ºF [29ºC]

Min. entering air, DB/WB

60ºF [16ºC]

40ºF [4.5ºC]

Rated entering air, DB/WB

80.6/66.2ºF [27/19ºC]

68ºF [20ºC]

Max. entering air, DB/WB

110/83ºF [43/28ºC]

80ºF [27ºC]

Water Limits

 

 

 

Min. entering water

20ºF [-6.7ºC]

20ºF [-6.7ºC]

Normal entering water

50-110ºF [10-43ºC]

30-70ºF [-1 to 21ºC]

Max. entering water

 

120ºF [49ºC]

120ºF [49ºC]

Normal Water Flow

1.5 to 3.0 gpm / ton

[1.6 to 3.2 l/m per kW]

 

 

31

Image 31
Contents HTV/HTD/HTH Series Two-Stage Geothermal Heat Pumps To 6 Tons Table of Contents Safety General Information Hanger Bracket Horizontal Unit LocationTypical Horizontal Unit Installation Horizontal InstallationSide to Back Discharge Conversion Field Conversion of Air DischargeCondensate Piping Horizontal Units Duct System Installationರ3HU RRW Vertical Unit Location Vertical InstallationAir Inlet Using a threaded pipe or similar device to clearMay ease final drain line installation ReturnFlushing the Earth Loop Water Connection InstallationPiping Installation External Flow Controller MountingGround-Loop Heat Pump Applications Fluid Volume gal liters per 100’ 30 meters PipeAntifreeze Pressure Tank and Pump Antifreeze Percentages by VolumeOpen Loop Ground Water Systems Water Quality StandardsTypical Open Loop/Well Application Ground-Water Heat Pump ApplicationsWater Quality Standards Hot Water Generator Typical HWG InstallationÅashes InstallationHigh Water Temperature 160ºF Control Logic ErrorWater Tank Refill Water Tank PreparationInitial Start-Up HWG Water PipingHT Series Electrical Data Electrical Line VoltageElectrical Line Voltage General Line Voltage WiringPower Connection HWG Wiring Split Units OnlyThermostat Connections Electrical Low Voltage WiringLow voltage Äeld wiring for units with ECM fan Low Water Temperature Cutout SelectionTwo-stage Units Accessory ConnectionsATM21U01 Electrical Thermostat WiringThermostat Installation Fault LEDECM Blower Control HT Units ECM Board Tap SettingsHT Series ECM Blower Performance Data CXM Controls Diagnostic Features Safety Features CXM ControlCXM Control Start-up Operation Unit Operation Stat signalECM fan PSC fan Not compatible with the CXM Nominal resistance at various temperaturesThermostat Signals CXM Thermostat DetailsVoltage utilization range complies with Ahri Standard Unit Commissioning And Operating ConditionsOperating Limits Commissioning ConditionsUnit and System Checkout Before Powering SYSTEM, please check the followingUnit Start-up Procedure Unit Start-Up and Operating ConditionsUnit Start-Up Procedure Antifreeze Correction Table Water Temperature Change Through Heat ExchangerUnit Operating Conditions HT Coax Water Pressure DropPsig HT Series Typical Unit Operating Pressures and TemperaturesGPM Cooling EAT 80/67F Performance Data HT 024 Full LoadPerformance Data HT 036 Full Load Performance Data HT 048 Full Load Performance Data HT 060 Full Load Performance Data HT 070 Full Load Preventive Maintenance Troubleshooting CXM Process Flow Chart CXM Functional Troubleshooting Flow ChartMain power problems Functional TroubleshootingPerformance Troubleshooting Htg Clg Possible Cause Solution Performance Troubleshooting+&$ Troubleshooting Form97B00