Heat Controller HTD CXM Control Start-up Operation, Unit Operation Stat signal, ECM fan PSC fan

Page 29

Installation, Operation & Maintenance

HTV/HTD/HTH SERIES

Heat Controller, Inc.

CXM Controls

CXM Control Start-up Operation

The control will not operate until all inputs and safety controls are checked for normal conditions. The compressor will have a

5 minute anti-short cycle delay at power-up. The first time after power-up that there is a call for compressor, the compressor will follow a 5 to 80 second random start delay. After the random start delay and anti-short cycle delay, the compressor relay will be energized. On all subsequent compressor calls, the random start delay is omitted.

Table 6b: Unit Operation

 

 

 

 

 

 

 

 

 

 

 

T-stat signal

 

HTT

 

TS

TS

 

ECM fan

ECM fan

PSC fan

 

 

 

 

 

 

 

 

G

 

Fan only

Fan only

Fan only

 

 

 

 

 

 

G, Y or Y1

 

Stage 1 heating1

Stage 1 heating3

Stage 1 heating5

G, Y1, Y2

 

Stage 2 heating1

Stage 2 heating3

Stage 2 heating5

G, Y1, Y2, W

 

Stage 3 heating1

Stage 3 heating3

N/A

G, W

 

Emergency heat

Emergency heat

Emergency heat

 

 

 

 

 

 

G, Y or Y1, O

 

Stage 1 cooling2

Stage 1 cooling4

Cooling6

G, Y1, Y2, O

 

Stage 2 cooling2

Stage 2 cooling4

N/A

 

 

 

 

 

 

1Stage 1 = 1st stage compressor, 1st stage fan operation Stage 2 = 2nd stage compressor, 2nd stage fan operation Stage 3 = 2nd stage compressor, auxiliary electric heat, 2nd or 3rd stage fan operation (depending on fan settings)

2Stage 1 = 1st stage compressor, 1st stage fan operation, reversing valve Stage 2 = 2nd stage compressor, 2nd stage fan operation, reversing valve

3Stage 1 = compressor, 1st stage fan operation Stage 2 = compressor, 2nd stage fan operation

Stage 3 = compressor, auxiliary electric heat, 2nd or 3rd stage fan operation (depending on fan settings)

4Stage 1 = compressor, 1st stage fan operation, reversing valve Stage 2 = compressor, 2nd stage fan operation, reversing valve

5Stage 1 = compressor, fan

Stage 2 = compressor, auxiliary electric heat, fan

6Cooling = compressor, fan, reversing valve

29

Image 29
Contents HTV/HTD/HTH Series Two-Stage Geothermal Heat Pumps To 6 Tons Table of Contents Safety General Information Hanger Bracket Horizontal Unit LocationTypical Horizontal Unit Installation Horizontal InstallationSide to Back Discharge Conversion Field Conversion of Air Dischargeರ3HU RRW Duct System InstallationCondensate Piping Horizontal Units Vertical Unit Location Vertical InstallationMay ease final drain line installation Using a threaded pipe or similar device to clearReturn Air InletPiping Installation Water Connection InstallationExternal Flow Controller Mounting Flushing the Earth LoopAntifreeze Fluid Volume gal liters per 100’ 30 meters PipeGround-Loop Heat Pump Applications Open Loop Ground Water Systems Antifreeze Percentages by VolumeWater Quality Standards Pressure Tank and PumpTypical Open Loop/Well Application Ground-Water Heat Pump ApplicationsWater Quality Standards Hot Water Generator Typical HWG InstallationHigh Water Temperature 160ºF InstallationControl Logic Error ÅashesInitial Start-Up Water Tank PreparationHWG Water Piping Water Tank RefillHT Series Electrical Data Electrical Line VoltagePower Connection General Line Voltage WiringHWG Wiring Split Units Only Electrical Line VoltageLow voltage Äeld wiring for units with ECM fan Electrical Low Voltage WiringLow Water Temperature Cutout Selection Thermostat ConnectionsTwo-stage Units Accessory ConnectionsThermostat Installation Electrical Thermostat WiringFault LED ATM21U01ECM Blower Control HT Units ECM Board Tap SettingsHT Series ECM Blower Performance Data CXM Controls Diagnostic Features Safety Features CXM ControlECM fan PSC fan Unit Operation Stat signalCXM Control Start-up Operation Thermostat Signals Nominal resistance at various temperaturesCXM Thermostat Details Not compatible with the CXMOperating Limits Unit Commissioning And Operating ConditionsCommissioning Conditions Voltage utilization range complies with Ahri StandardUnit Start-up Procedure Before Powering SYSTEM, please check the followingUnit Start-Up and Operating Conditions Unit and System CheckoutUnit Start-Up Procedure Unit Operating Conditions Water Temperature Change Through Heat ExchangerHT Coax Water Pressure Drop Antifreeze Correction TablePsig HT Series Typical Unit Operating Pressures and TemperaturesGPM Cooling EAT 80/67F Performance Data HT 024 Full LoadPerformance Data HT 036 Full Load Performance Data HT 048 Full Load Performance Data HT 060 Full Load Performance Data HT 070 Full Load Preventive Maintenance Troubleshooting CXM Process Flow Chart CXM Functional Troubleshooting Flow ChartMain power problems Functional TroubleshootingPerformance Troubleshooting Htg Clg Possible Cause Solution Performance Troubleshooting+&$ Troubleshooting Form97B00