Heat Controller HTD, HTV, HTH Unit Start-Up and Operating Conditions, Unit and System Checkout

Page 32

Installation, Operation & Maintenance

HTV/HTD/HTH SERIES

Heat Controller, Inc.

Unit Start-Up and Operating Conditions

Unit and System Checkout

BEFORE POWERING SYSTEM, please check the following:

UNIT CHECKOUT

Balancing/shutoff valves: Insure that all isolation valves are open and water control valves are wired.

Line voltage and wiring: Verify that voltage is within an acceptable range for the unit and wiring and fuses/breakers are properly sized. Verify that low voltage wiring is complete. Unit control transformer: Insure that transformer has the properly selected voltage tap. Residential 208-230V units are factory wired for 230V operation unless specified otherwise. Loop/water piping is complete and purged of air. Water/ piping is clean.

Antifreeze has been added if necessary.

Entering water and air: Insure that entering water and air temperatures are within operating limits of Table 8.

Low water temperature cutout: Verify that low water temperature cut-out on the CXM/CXM control is properly set. Unit fan: Manually rotate fan to verify free rotation and insure that blower wheel is secured to the motor shaft. Be sure to remove any shipping supports if needed. DO NOT oil motors upon start-up. Fan motors are pre-oiled at the factory. Check unit fan speed selection and compare to design requirements.

Condensate line: Verify that condensate line is open and properly pitched toward drain.

HWG pump is disconnected unless piping is completed and air has been purged from the system.

Water flow balancing: Record inlet and outlet water temperatures for each heat pump upon startup. This check can eliminate nuisance trip outs and high velocity water flow that could erode heat exchangers.

Unit air coil and filters: Insure that filter is clean and accessible. Clean air coil of all manufacturing oils.

Unit controls: Verify that CXM field selection options are properly set. Low voltage wiring is complete.

Blower speed is set. Service/access panels are in place.

SYSTEM CHECKOUT

System water temperature: Check water temperature for proper range and also verify heating and cooling set points for proper operation.

System pH: Check and adjust water pH if necessary to maintain a level between 6 and 8.5. Proper pH promotes longevity of hoses and fittings (see Table 3).

System flushing: Verify that all air is purged from the system. Air in the system can cause poor operation or system corrosion. Water used in the system must be potable quality initially and clean of dirt, piping slag, and strong chemical cleaning agents. Some antifreeze solutions may require distilled water.

Flow Controller pump(s): Verify that the pump(s) is wired, purged of air, and in operating condition.

System controls: Verify that system controls function and operate in the proper sequence.

Low water temperature cutout: Verify that low water temperature cut-out controls are set properly (FP1 - JW3).

Miscellaneous: Note any questionable aspects of the installation.

CAUTION!

CAUTION! Verify that ALL water control valves are open and allow water flow prior to engaging the compressor. Freezing of the coax or water lines can permanently damage the heat pump.

CAUTION!

CAUTION! To avoid equipment damage, DO NOT leave system filled in a building without heat during the winter unless antifreeze is added to the water loop. Heat exchangers never fully drain by themselves and will freeze unless winterized with antifreeze.

Unit Start-up Procedure

1.Turn the thermostat fan position to “ON.” Blower should start.

2.Balance air flow at registers.

3.Adjust all valves to their full open position. Turn on the line power to all heat pump units.

4.Room temperature should be within the minimum-maximum ranges of Table 8b. During start-up checks, loop water temperature entering the heat pump should be between 30°F [-1°C] and 95°F [35°C].

5.Two factors determine the operating limits of water source heat pumps, (a) return air temperature, and (b) water temperature. When any one of these factors is at a minimum or maximum level, the other factor must be at normal level to insure proper unit operation.

a.Adjust the unit thermostat to the warmest setting. Place the thermostat mode switch in the “COOL” position. Slowly reduce thermostat setting until the compressor activates.

b.Check for cool air delivery at the unit grille within a few minutes after the unit has begun to operate.

Note: Units have a five minute time delay in the control circuit that can be bypassed on the CXM/CXM control board as shown below in Figure 27. See controls description for details.

c.Verify that the compressor is on and that the water flow rate is correct by measuring pressure drop through the heat exchanger using the P/T plugs and comparing to Tables 9a through 9b.

d.Check the elevation and cleanliness of the condensate lines. Dripping may be a sign of a blocked line. Check that the condensate trap is filled to provide a water seal.

e.Refer to Table 10. Check the temperature of both entering and leaving water. If temperature is within range, proceed with the test. If temperature is outside of the operating range, check refrigerant pressures and compare to Tables 11 through 12. Verify correct water flow by comparing unit

32

Image 32
Contents HTV/HTD/HTH Series Two-Stage Geothermal Heat Pumps To 6 Tons Table of Contents Safety General Information Horizontal Unit Location Hanger BracketHorizontal Installation Typical Horizontal Unit InstallationField Conversion of Air Discharge Side to Back Discharge Conversionರ3HU RRW Duct System InstallationCondensate Piping Horizontal Units Vertical Installation Vertical Unit LocationUsing a threaded pipe or similar device to clear May ease final drain line installationReturn Air InletWater Connection Installation Piping InstallationExternal Flow Controller Mounting Flushing the Earth LoopAntifreeze Fluid Volume gal liters per 100’ 30 meters PipeGround-Loop Heat Pump Applications Antifreeze Percentages by Volume Open Loop Ground Water SystemsWater Quality Standards Pressure Tank and PumpGround-Water Heat Pump Applications Typical Open Loop/Well ApplicationWater Quality Standards Typical HWG Installation Hot Water GeneratorInstallation High Water Temperature 160ºFControl Logic Error ÅashesWater Tank Preparation Initial Start-UpHWG Water Piping Water Tank RefillElectrical Line Voltage HT Series Electrical DataGeneral Line Voltage Wiring Power ConnectionHWG Wiring Split Units Only Electrical Line VoltageElectrical Low Voltage Wiring Low voltage Äeld wiring for units with ECM fanLow Water Temperature Cutout Selection Thermostat ConnectionsAccessory Connections Two-stage UnitsElectrical Thermostat Wiring Thermostat InstallationFault LED ATM21U01ECM Blower Control ECM Board Tap Settings HT UnitsHT Series ECM Blower Performance Data CXM Controls Safety Features CXM Control Diagnostic FeaturesECM fan PSC fan Unit Operation Stat signalCXM Control Start-up Operation Nominal resistance at various temperatures Thermostat SignalsCXM Thermostat Details Not compatible with the CXMUnit Commissioning And Operating Conditions Operating LimitsCommissioning Conditions Voltage utilization range complies with Ahri StandardBefore Powering SYSTEM, please check the following Unit Start-up ProcedureUnit Start-Up and Operating Conditions Unit and System CheckoutUnit Start-Up Procedure Water Temperature Change Through Heat Exchanger Unit Operating ConditionsHT Coax Water Pressure Drop Antifreeze Correction TableHT Series Typical Unit Operating Pressures and Temperatures PsigGPM Performance Data HT 024 Full Load Cooling EAT 80/67FPerformance Data HT 036 Full Load Performance Data HT 048 Full Load Performance Data HT 060 Full Load Performance Data HT 070 Full Load Preventive Maintenance Troubleshooting CXM Functional Troubleshooting Flow Chart CXM Process Flow ChartFunctional Troubleshooting Main power problemsPerformance Troubleshooting Performance Troubleshooting Htg Clg Possible Cause SolutionTroubleshooting Form +&$97B00