3.1Package Inspection

NOTE: The distributor presented your AURORA WIND Inverter to the delivering carrier securely packed and in perfect condition. Upon acceptance of the package from the distributor the delivering carrier assumes responsibility for its safe arrival to you. Regardless of the attention paid by carrier in handling it, sometimes the package and its contents might be damaged.

Please, carry out the following checks:

Examine the shipping box for any visible damage: punctures, dents or any other signs of possible internal damage;

Describe any damage or shortage on the receiving documents and have the carrier sign their full name;

Open the shipping box and inspect the contents for internal damage. While unpacking, be careful not to discard any equipment, parts or manuals. If any damage is detected, call the delivering carrier to determine the appropriate action. They may require an inspection. Save all shipping material for the inspector to see!

If the inspection reveals damage to the inverter call your supplier, or authorized distributor. They will determine if the equipment should be returned for repair. They will also provide instructions on how to get the equipment repaired;

It is your responsibility to file a claim with the delivery carrier. Failure to properly file a claim for shipping damages may void warranty service for any physical damages later reported for repair;

Save the AURORA original packaging, as it will have to be used in case the equipment has to be shipped out for repairs, or the responsible inspector requires it.

Image 16
Contents AURORA Important Safety Instructions Revision TableImportant Safety Instructions Assembly Useful Information and Safety Standard ForewordGeneral Maintenance and Service Electrical ConnectionOperation Save ALL Documents in a Safe PlacePVI-3600-OUTD-UK-F-W Contents Page Wind Energy Main Elements of a Wind System Simplified diagram of a Wind system Data Transmission and Check Aurora Technical DescriptionInverter Protective Devices Anti-Islanding Ground FaultFurther Protective Devices System Design Package Inspection Package Check List Description Quantity No Choosing Installation Location Minimum clearance requirementsWall mounting diagram Wall MountingPage Inverter tilted mounting Preliminaries to Electrical Connections General wiring diagram Position of the holes on the bottom side Removing the side panel Page Location of Main Ground PE Screw Connect Aurora to the Dc disconnect switches AuroraPV Input Close the side panel START-UP User’s Interface Mode Data Transmission Options Real time data Available DataInternally Logged Data KEY LED IndicatorsLED on LED blinking LED off Any of the above conditions Installation phase Aurora is disconnected from grid Sleep Mode Aurora Initialization and Grid CheckAurora Under Production Ground InsulationRS-485 Address Setting Signal Malfunction-Fault SignalMessages and Error Codes Error Description LCD Display Second screen Serial Number and Firmware release number Pac ## W Vin Timegrid hhmmss Numgrid ## Error Grid fail Data RS-485 serial link Multiple units connection Power Line Modem PLM Data transmission to a PCData transmission to Aurora Easy Control Display menù Manual address settingAddress Information Automatic setting Verifying the paralleled input configurationSET in Mode Parallel Measurement Accuracy Data Description UnitData Resolution Accuracy Display Measurement Troubleshooting Info Aurora Input Values Value PVI-3600-OUTD-UK-F-WGrid protection characteristics Output Values DescriptionGeneral characteristics Description Value Power Derating due to Ambient Temperature Power DeratingPower Derating due to Input Voltage