Installation and Operator’s Manual | Page 4 of 63 |
|
USEFUL INFORMATION AND SAFETY STANDARD
FOREWORD
The installation of AURORA must be performed in full compliance with national and local standards and regulations
AURORA has no internal user serviceable parts other than fuses.
For any maintenance or repair please contact the nearest authorized repair center. Please contact your reseller if you need to know the nearest authorized repair center.
Read and understand all the instructions contained in this manual and become familiar with the safety symbols in the relevant paragraphs before you install and commission the equipment
The connection to the distribution grid must be done only after receiving approval from the distribution utility as required by national and state interconnection regulations, and can be done only by qualified personnel.
Safety Brake the wind turbine to prevent any possibility of high voltages appearing at the connecting cable terminations.
The AC disconnecting means must be opened before working on the Aurora Wind inverters.
GENERAL
During inverter operation, some parts can be powered, some not properly insulated and, in some cases, some parts can move or rotate, or some surfaces can be hot. Unauthorized removal of the necessary protections, improper use, incorrect installation or incorrect operation may lead to serious damage to people and objects.
All transport, installation and
According to these basic safety rules, qualified and trained people have skills for the assembling,
ASSEMBLY
Devices shall be assembled and cooled according to the specifications mentioned in the corresponding documents.