1)Sleep Mode

AURORA is in the disconnection phase; this happens whenever the input power is too low to export power to the feed grid and power the inverter control system as well.

2)AURORA Initialization and Grid Check

The unit is in the initialization phase: energy supply for the inverter control system is high enough. AURORA is also checking that starting conditions – such as input voltage, starting time, etc. - necessary for the initialization process, are satisfied. Grid check is then started.

3)AURORA Under Production

Once all electronic and safety self-tests are over, the unit starts the exporting process.

As stated above, during this phase AURORA carries out an automatic search and analysis of the wind turbine power curve max power point tracking (MPPT).

4)Ground Insulation

The inverter signals a ground fault.

This can be due to an insulation defect in the wind input connection.

Insulation Defect

An insulation fault condition has been detected in the input wiring from the Wind Interface box or a corresponding connection is conductive with the grounded potential.

WARNING: Trying to remove the fault by yourself is extremely dangerous. The instructions below have to be followed very carefully. In case you are not experienced or skilled enough to work safely on the unit, contact a specialized technician.

What to do after an insulation defect has been found Whenever the red LED comes on, press the special multifunction push-button next to the LCD side to reset it. If this fault can be reset, the AURORA will continue working. If the fault cannot be

Image 37
Contents AURORA Revision Table Important Safety InstructionsImportant Safety Instructions Assembly Useful Information and Safety Standard ForewordGeneral Electrical Connection Maintenance and ServiceOperation Save ALL Documents in a Safe PlacePVI-3600-OUTD-UK-F-W Contents Page Wind Energy Main Elements of a Wind System Simplified diagram of a Wind system Aurora Technical Description Data Transmission and CheckInverter Protective Devices Anti-Islanding Ground FaultFurther Protective Devices System Design Package Inspection Package Check List Description Quantity No Minimum clearance requirements Choosing Installation LocationWall Mounting Wall mounting diagramPage Inverter tilted mounting Preliminaries to Electrical Connections General wiring diagram Position of the holes on the bottom side Removing the side panel Page Location of Main Ground PE Screw Aurora Connect Aurora to the Dc disconnect switchesPV Input Close the side panel START-UP User’s Interface Mode Data Transmission Options Real time data Available DataInternally Logged Data KEY LED IndicatorsLED on LED blinking LED off Any of the above conditions Installation phase Aurora is disconnected from grid Aurora Initialization and Grid Check Sleep ModeAurora Under Production Ground InsulationRS-485 Address Setting Signal Malfunction-Fault SignalMessages and Error Codes Error Description LCD Display Second screen Serial Number and Firmware release number Pac ## W Vin Timegrid hhmmss Numgrid ## Error Grid fail Data RS-485 serial link Multiple units connection Data transmission to a PC Power Line Modem PLMData transmission to Aurora Easy Control Display menù Manual address settingAddress Information Verifying the paralleled input configuration Automatic settingSET in Mode Parallel Data Description Unit Measurement AccuracyData Resolution Accuracy Display Measurement Troubleshooting Info Aurora Input Values PVI-3600-OUTD-UK-F-W ValueOutput Values Description Grid protection characteristicsGeneral characteristics Description Value Power Derating due to Ambient Temperature Power DeratingPower Derating due to Input Voltage