
Installation and Operator’s Manual | Page 22 of 63 |
| |
|
|
3.5Preliminaries to Electrical Connections
WARNING: The electrical connections can be done only after AURORA is firmly mounted to the wall.
WARNING: The connection of AURORA to the electrical distribution grid must be performed only by skilled operators and after having received authorization from the utility that operates the grid.
WARNING: For further details on each single step, carefully read and follow the
WARNING: Always respect the nominal ratings of voltage and current defined in chapter 9 (Technical Characteristics) when designing your system. In particular, regarding the wind system:
Maximum Dc input voltage for the MPPT input circuit: 600Vdc in any condition.
Maximum Dc input current for the MPPT input circuit: 20Adc in any condition.
WARNING: Make sure that your installation design is in compliance with National electrical wiring methods and local std regulations, if more
stringent.
WARNING: The wind turbine must be braked to a zero energy state during the installation procedure. The protection must be removed once the installation has been verified and is ready for safe operation.
WARNING:
NOTE: The inverter shall be connected ONLY to a dedicated branch circuit. According to the typical assembly diagram (see Fig.10). An AC disconnecting mean with