Grizzly MODEL G0765 owner manual Tailstock Rear Controls, End Gears

Page 8

Tailstock

Rear Controls

T

M

N

S

O

P

Q

R

U

Figure 5. Rear controls.

Figure 4. Tailstock controls.

M. Tailstock Quill: Moves a tool or center mounted in the tailstock toward or away from the workpiece.

N.Tailstock Quill Lock Lever: Secures the quill position.

O.Tailstock Lock Lever: Secures tailstock in position along the bedway.

P.Graduated Scale: Indicates quill movement in increments of 0.001", with one full revolu- tion equaling 0.04" of quill travel.

Q.Quill Handwheel: Moves quill toward or away from spindle.

R.Offset Scale: Indicates relative distance of tailstock offset from spindle centerline.

S.Tailstock Offset Screws: Adjusts tailstock offset left or right from spindle centerline (1 of 2).

T.High/Low Range Lever: Sets the spindle speed range to LOW (100–1000 RPM) or HIGH (100–2000 RPM). Do NOT shift while lathe is running or damage to machine may occur!

U.Feed Direction Lever: Used to select leadscrew rotation direction. Up is for clock- wise rotation and leftward carriage move- ment. Center is neutral. Down is for counter- clockwise leadscrew rotation and rightward carriage movement.

End Gears

End

Gears

Figure 6. End gear components.

Configuring the end gears (shown in Figure 6) controls the speed of the leadscrew for thread- ing or power feed operations.

-6-

Model G0765 (Mfd. Since 12/13)

Image 8
Contents Model G0765 14 Benchtop Lathe Page Table of Contents Service Control Panel WiringContact Info IntroductionMachine Description Manual Accuracy Identification Carriage Controls ComponentsControl Panel Tailstock Rear Controls End GearsMachine Data Sheet Tailstock Info Features Safety Safety Instructions for MachineryPage Additional Safety for Metal Lathes Additional Chuck Safety Power Supply AvailabilityFull-Load Current Rating 110V Circuit RequirementsGrounding & Plug Requirements Extension CordsMinimum Gauge Size 14 AWG 50 ftSetup Needed for SetupPreparation UnpackingPackaged Components Figures Qty Installed Components Figure QtyInventory Basic steps for removing rust preventative CleanupBefore cleaning, gather the following Site Considerations Assembly Power ConnectionConnecting Power Disconnecting PowerTest Run Disengaged Spindle Break-In Recommended AdjustmentsFactory adjustments that should be verified Operations Operation OverviewInstallation Removal Device Chuck & Faceplate MountingTools Needed Qty Chuck InstallationTo install the chuck Scroll Chuck Clamping Changing Jaw SetTo change the jaw set Faceplate To mount a non-concentric workpiece to the faceplateUsing Quill TailstockTailstock Quill Specs Positioning TailstockInstalling Tooling Offsetting TailstockTo install tooling in the tailstock Removing ToolingAligning Tailstock to Spindle Centerline To offset the tailstockItems Needed Qty To align the tailstock to the spindle centerlinePage Centers Dead CentersMounting Dead Center in Spindle Removing Center from SpindleMounting Center in Tailstock Removing Center from TailstockMounting Workpiece Between Centers To mount a center in the tailstockSteady Rest Tools Needed for Installation/Removal QtyTo install and use the steady rest Installing Tool Compound Rest Four-Way Tool PostAligning Cutting Tool with Spindle Centerline Below are two common methodsTo align cutting tool with tailstock center Top ViewManual Feed Spindle SpeedSetting Spindle Speed Range Setting Spindle Direction & SpeedConfiguration Example To set spindle speed to 100 RPMPower Feed Power Feed ControlsSetting Power Feed Rate To set power feed for 0.04 in./revPrimary Threading Configuration Power Feed ConfigurationSecondary Threading Configuration End Gears40T 65T Gear 50 T Ge ar 20 TPI End Gear Configuration ExampleTo configure end gears for threading 20 TPI Page Threading Headstock Threading ControlsTo set the lathe to thread 20 TPI Feed Direction LeverThread Dial Thread Dial ChartApron Threading Controls Dial Number Thread Dial Accessories D3640-Shop Fox Tool Table PlusSchedule MaintenanceCleaning/Protecting Ball Oilers LubricationLubrication Frequency Cross Slide & Compound Slide Leadscrew & Carriage RackBedways Machine Storage Change Gear BushingTumbler Gears Preparing Lathe for StorageSymptom Possible Cause Possible Solution ServiceTroubleshooting Lathe Operation Backlash Adjustment Leadscrew End-Play AdjustmentCross Slide To remove leadscrew end playGib Adjustment To adjust cross slide and compound slide gibsHalf Nut Adjustment Fuse ReplacementTo adjust half nut To replace fuseBrush Replacement To replace motor brushesTiming Belt Tension Replacement Tensioning Timing BeltReplacing Timing Belt Wiring Wiring Safety InstructionsControl Panel Wiring Machine FrameControl Panel Wiring Photos G0765 wiring overviewMotor/Speed Sensor/ Plug Wiring 110 VACMain Description Description Labels & Cosmetics Front 255 254 256 257 259 258 253 252 261 251 260Threading Charts AppendixWarranty Card CommentsGrizzly INDUSTRIAL, INC BOX BELLINGHAM, WAWarranty & Returns