Chapter 1 Preparing for Installation
Site Requirement Guidelines
–Frame is bolted to the floor and is secured to the building structure using either wall brackets or overhead brackets.
•When mounting the router in a
•Install the
•To avoid noise interference in network interface cables, do not route them directly across or along power cables.
Figure 1-4 shows the top-down view chassis dimensions of the Cisco ASR 9001 Router.
Figure 1-4 Cisco ASR 9001 Router Chassis Footprint and Dimensions—Top View
Rear of chassis
17.42 Inch
(44.2 cm)
18.54Inch
(47.1 cm)
19.79inch
(50.3 cm)
1.25inch
(3.2 cm)
19 inch |
(48.3 cm) |
Front of chassis
331881
Cisco ASR 9001 and Cisco ASR
|
| |
|