Chapter 1 Preparing for Installation
Site Requirement Guidelines
Caution Do not install the Cisco ASR 9001 Router in any type of
Air Flow Guidelines for Enclosed Rack Installation
To install a Cisco ASR 9001 Router in a
If you are mounting the chassis in a
•Rear: Minimum of 3.15 inches (8.00 cm) of clearance
•Sides: Minimum of 6 inches (15.24 cm) of clearance on each side of the chassis.
Figure 1-8 shows the side and rear chassis air flow clearance requirements for mounting the
Cisco ASR 9001 Router in a 4-post enclosed rack.
|
| Cisco ASR 9001 and Cisco ASR |
|
| |
|
|
| |||
|
|
|
| ||
|
|
|
|