Cisco Systems 9001S, ASR9001s manual Nebs Supplemental Unit Bonding and Grounding Guidelines

Page 30

Chapter 1 Preparing for Installation

Site Requirement Guidelines

NEBS Supplemental Unit Bonding and Grounding Guidelines

Although the router chassis requires a safety earth ground connection as part of the power cabling to power modules, you must permanently connect the central office ground system or interior equipment grounding system to the supplemental bonding and grounding connection on the side of the router chassis to meet network equipment building system (NEBS) requirements as well as safety compliance requirements. These grounding points are referred to as the NEBS bonding and grounding points.

Figure 1-22shows the NEBS grounding locations for the Cisco ASR 9001 Router.

Note These bonding and grounding connections satisfy the Telcordia NEBS requirements for supplemental bonding and grounding connections. If you are not installing the router in a NEBS environment, you can choose to bypass these guidelines and rely on the safety earth ground connections to the AC or DC power modules.

Figure 1-22 NEBS Bonding and Grounding Points on the Cisco ASR 9001 Router

1

332017

1NEBS grounding point on side of chassis

To ensure a satisfactory supplemental ground connection to the router, use these parts:

One grounding lug, which has two M6 bolt holes with 0.625- to 0.75-inch (15.86- to 19.05-mm) spacing between them, and a wire receptacle large enough to accept a six AWG or larger, multistrand copper wire. For four AWG cable, use Panduit part number LCD4-14AF-L; for six AWG, use Panduit part number LCD6-14AF-L.

Two 10-32 round-head screws and two locking washers (nickel-plated brass is ideal).

 

Cisco ASR 9001 and Cisco ASR 9001-S Routers Hardware Installation Guide

1-20

OL-26701-02

Image 30
Contents Americas Headquarters Text Part Number OL-26701-02Page Cisco ASR 9001 Router Cable Management Status LEDs Site Log B-1 Purpose Changes to This DocumentAudience Revision Date Change SummaryDocument Organization Document ConventionsObtaining Documentation and Submitting a Service Request OL-26701-02 Preparing for Installation Safety Guidelines General Safety GuidelinesCompliance and Safety Information Laser SafetyEnergy Hazard Preventing Electrostatic Discharge Damage Lifting GuidelinesSite Layout and Equipment Dimensions Site Requirement GuidelinesRear of chassis Site Wiring Guidelines Chassis Air Flow GuidelinesRack-Mounting and Air Flow Clearance Guidelines Air exhaust Room airTelco 2-Post Rack Equipment Rack TypesOpen 4-Post Rack Enclosed Rack with Perforated SidesAir Flow Guidelines for Enclosed Rack Installation Temperature and Humidity Guidelines Power Connection GuidelinesAC Powered Routers AC Power Cord IllustrationsAC Power Cord CAB-AC 12 AC Power Cord CAB-ACI 15 AC Power Cord CAB-ACU DC Powered Router 18 AC Power Cord CAB-9K10A-EU20 DC Power Cable Terminal Block 331933 Nebs Supplemental Unit Bonding and Grounding Guidelines Cisco ASR 9001 Router Port Connection Guidelines 23 Cisco ASR 9001 Router Front Panel PortsMLT3 Port NameDescription SMBConsole Port Signals Signal Input/Output DescriptionConsole Port and Auxiliary Port Connection Guidelines Auxiliary Port Signals 10Base-T, 100Base-TX Signal 1000Base-T SignalManagement LAN Ports Connection Guidelines Management LAN Port LED Indicators Management LAN RJ-45 CablingSync Port LED Indicators Sync Ports Connection GuidelinesPin Signal RP External USB PortOL-26701-02 Pre-Installation Considerations and Requirements Installation OverviewUnpacking the Cisco ASR 9001 Router Required Tools and EquipmentPositioning the Router Verifying Rack Dimensions Installing the Chassis in a 2-Post RackRack-Mounting the Router Chassis Page Correct Lifting Positions Installing the Chassis in a 4-post Rack Supplemental Bonding and Grounding ConnectionsNebs Bonding and Grounding for the Cisco ASR 9001 Router Installing Modules and Cables in the Chassis Fixed 4x10-Gigabit Ethernet PortsModular Port Adapters Port Gigabit Ethernet Modular Port AdapterPort 10 Gigabit Ethernet Modular Port Adapter LED Label Color State MeaningStatus 4-Port 10 Gigabit Ethernet Modular Port Adapter Installing and Removing Modular Port Adapters 2-Port 10 Gigabit Ethernet Modular Port AdapterHandling Modular Port Adapters MPAs Online Insertion and RemovalModular Port Adapter MPA Installation and Removal GE MPACleaning Optical Devices Optical Device Installation and RemovalChecking the Installation Verifying the InstallationPage Using the ping Command to Verify Network Connectivity Command Type of Information ProvidedInstalling and Removing SFP Modules Installing and Removing XFP ModulesInstalling a Cable Management Tray Cable ManagementCable Management Tray Cable-Management Tray Installation and Removal Removing a Cable-Management TrayInstalling a Cable Management Bracket Cable Management BracketCable-Management Bracket Installation and Removal Removing a Cable-Management BracketConnecting Route Processor Cables 10 RP Console and Auxiliary Port ConnectionsConnecting to the RP Console Port Connecting to the RP Auxiliary PortConnecting to the RP Ethernet Management Ports Connecting Power to the Router Connecting Power to an AC-Powered RouterProceed to the Powering on the Router section on Connecting Power to a DC-Powered Router Negative to negativePowering on the Router 12 Typical Power Connections for a Single DC Power ModuleOL-26701-02 Troubleshooting Overview Troubleshooting Using a Subsystem ApproachIdentifying Startup Issues Normal Router Startup SequenceTroubleshooting the Power Subsystem Troubleshooting the AC-Input Power SubsystemPower Module Status Indicators LEDTroubleshooting the DC-Input Power Subsystem Troubleshooting a DC Power ModuleHardware and Software Identification Additional Power Subsystem Troubleshooting InformationObtaining Temperature and Environmental Information Hardware IDTroubleshooting the Installation Troubleshooting the Power Distribution System 8VLGTNGTroubleshooting the Route Processor Subsystem Route Processor OverviewRP Front Panel Indicators Indicator LabelColor Description Ethernet Ports and Status LEDs Auxiliary and Console PortsInitial Boot Process Troubleshooting the Line CardMonitoring Critical, Major, and Minor Alarm Status Status LEDsParameter Configuration File Entry Default Value Configuring and Troubleshooting Line Card InterfacesConfiguration Parameters MTUUsing Configuration Commands Basic Line Card ConfigurationLine Card Interface Address Verifying the Transceiver Modules PID XFP-10G-MM-SR Advanced Line Card Troubleshooting Show logging Show diag slot Show context location slotTroubleshooting the Cooling Subsystem Power Module FansFan Tray Operation Over-temperature Conditions Isolating Cooling Subsystem ProblemsOL-26701-02 Prerequisites and Preparation Field Replaceable UnitsPowering Off the Router Removing and Replacing the Fan TrayRemoving and Replacing AC or DC Power System Components Power Module Replacement Guidelines Removing and Replacing an AC or DC Power ModuleRemoving an AC or DC Power Module Installing an AC or DC Power Module Removing a Chassis from the Equipment RackInstalling a Replacement Chassis in the Equipment Rack Packing a Chassis for ShipmentTechnical Specifications Description Value Table A-3 Cisco ASR 9001 AC Electrical Specifications Minimum Maximum Range Nominal Range Minimum Nominal MaximumParameter Value Typical Maximum Part Number Description Wavelength Fiber Type DistancePart Number Description Part Number Description Wavelength Color IdentifierITU Grid Part Number Description Wavelength ITU Grid XFP-10GZR-OC192LR Fiber Type DistanceXFP-10GLR-OC192SR XFP-10G-MM-SRDWDM-XFP-C OL-26701-02 Site Log Appendix B Site Log Numerics IN-2 See EMI EMIACT CwdmLED Dwdm LinkNebs IN-5IN-6 IN-7 IN-8