Chapter 2 Unpacking and Installing the Chassis

Rack-Mounting the Router Chassis

Use this procedure to install the chassis in the equipment rack:

Step 1 With two people’s aid, lift the chassis into the rack holding top and bottom of the chassis (see Figure 2-4).

Figure 2-4 Correct Lifting Positions

332152

Caution Do not grasp air inlet or exhaust when lifting the router chassis.

Step 2 Position the chassis until the rack-mounting flanges are flush against the mounting rails on the rack.

Step 3 Hold the chassis in position against the mounting rails while the second person finger-tightens a screw to the rack rails on each side of the chassis.

Step 4 Finger-tighten two more screws to the rack rails on each side of the chassis. Space the screws evenly between the top and bottom of the chassis.

Step 5 Attach the side brackets to the left and right side of the chassis by finger-tightening two screws through each bracket into the chassis.

Step 6 Attach the side bracket front flanges to the rack by finger-tightening two screws through each bracket flange into the front mounting rails of the rack.

Step 7 Fully tighten both the screws on the chassis mounting flanges on each side to secure the chassis to the rack rails.

Step 8 Fully tighten the two screws on each side bracket to secure the brackets to the chassis.

Step 9 Fully tighten the two screws on each side bracket flange to secure the brackets to the rack rails.

Cisco ASR 9001 and Cisco ASR 9001-S Routers Hardware Installation Guide

2-6

OL-26701-02

 

 

Image 44
Contents Americas Headquarters Text Part Number OL-26701-02Page Cisco ASR 9001 Router Cable Management Status LEDs Site Log B-1 Changes to This Document AudiencePurpose Revision Date Change SummaryDocument Organization Document ConventionsObtaining Documentation and Submitting a Service Request OL-26701-02 Preparing for Installation Safety Guidelines General Safety GuidelinesEnergy Hazard Compliance and Safety InformationLaser Safety Preventing Electrostatic Discharge Damage Lifting GuidelinesSite Layout and Equipment Dimensions Site Requirement GuidelinesRear of chassis Site Wiring Guidelines Chassis Air Flow GuidelinesRack-Mounting and Air Flow Clearance Guidelines Air exhaust Room airTelco 2-Post Rack Equipment Rack TypesOpen 4-Post Rack Enclosed Rack with Perforated SidesAir Flow Guidelines for Enclosed Rack Installation Temperature and Humidity Guidelines Power Connection GuidelinesAC Powered Routers AC Power Cord IllustrationsAC Power Cord CAB-AC 12 AC Power Cord CAB-ACI 15 AC Power Cord CAB-ACU DC Powered Router 18 AC Power Cord CAB-9K10A-EU20 DC Power Cable Terminal Block 331933 Nebs Supplemental Unit Bonding and Grounding Guidelines Cisco ASR 9001 Router Port Connection Guidelines 23 Cisco ASR 9001 Router Front Panel PortsPort Name DescriptionMLT3 SMBConsole Port and Auxiliary Port Connection Guidelines Console Port SignalsSignal Input/Output Description Management LAN Ports Connection Guidelines Auxiliary Port Signals10Base-T, 100Base-TX Signal 1000Base-T Signal Management LAN Port LED Indicators Management LAN RJ-45 CablingSync Port LED Indicators Sync Ports Connection GuidelinesPin Signal RP External USB PortOL-26701-02 Pre-Installation Considerations and Requirements Installation OverviewUnpacking the Cisco ASR 9001 Router Required Tools and EquipmentPositioning the Router Rack-Mounting the Router Chassis Verifying Rack DimensionsInstalling the Chassis in a 2-Post Rack Page Correct Lifting Positions Installing the Chassis in a 4-post Rack Supplemental Bonding and Grounding ConnectionsNebs Bonding and Grounding for the Cisco ASR 9001 Router Installing Modules and Cables in the Chassis Fixed 4x10-Gigabit Ethernet PortsModular Port Adapters Port Gigabit Ethernet Modular Port AdapterStatus Port 10 Gigabit Ethernet Modular Port AdapterLED Label Color State Meaning 4-Port 10 Gigabit Ethernet Modular Port Adapter Installing and Removing Modular Port Adapters 2-Port 10 Gigabit Ethernet Modular Port AdapterHandling Modular Port Adapters MPAs Online Insertion and RemovalModular Port Adapter MPA Installation and Removal GE MPAOptical Device Installation and Removal Checking the InstallationCleaning Optical Devices Verifying the InstallationPage Using the ping Command to Verify Network Connectivity Command Type of Information ProvidedInstalling and Removing SFP Modules Installing and Removing XFP ModulesCable Management Tray Installing a Cable Management TrayCable Management Cable-Management Tray Installation and Removal Removing a Cable-Management TrayInstalling a Cable Management Bracket Cable Management BracketCable-Management Bracket Installation and Removal Removing a Cable-Management BracketConnecting Route Processor Cables 10 RP Console and Auxiliary Port ConnectionsConnecting to the RP Ethernet Management Ports Connecting to the RP Console PortConnecting to the RP Auxiliary Port Connecting Power to the Router Connecting Power to an AC-Powered RouterProceed to the Powering on the Router section on Connecting Power to a DC-Powered Router Negative to negativePowering on the Router 12 Typical Power Connections for a Single DC Power ModuleOL-26701-02 Troubleshooting Overview Troubleshooting Using a Subsystem ApproachIdentifying Startup Issues Normal Router Startup SequenceTroubleshooting the Power Subsystem Troubleshooting the AC-Input Power SubsystemPower Module Status Indicators LEDTroubleshooting the DC-Input Power Subsystem Troubleshooting a DC Power ModuleAdditional Power Subsystem Troubleshooting Information Obtaining Temperature and Environmental InformationHardware and Software Identification Hardware IDTroubleshooting the Installation Troubleshooting the Power Distribution System 8VLGTNGTroubleshooting the Route Processor Subsystem Route Processor OverviewColor Description RP Front Panel IndicatorsIndicator Label Ethernet Ports and Status LEDs Auxiliary and Console PortsTroubleshooting the Line Card Monitoring Critical, Major, and Minor Alarm StatusInitial Boot Process Status LEDsConfiguring and Troubleshooting Line Card Interfaces Configuration ParametersParameter Configuration File Entry Default Value MTULine Card Interface Address Using Configuration CommandsBasic Line Card Configuration Verifying the Transceiver Modules PID XFP-10G-MM-SR Advanced Line Card Troubleshooting Show logging Show diag slot Show context location slotFan Tray Operation Troubleshooting the Cooling SubsystemPower Module Fans Over-temperature Conditions Isolating Cooling Subsystem ProblemsOL-26701-02 Prerequisites and Preparation Field Replaceable UnitsPowering Off the Router Removing and Replacing the Fan TrayRemoving and Replacing AC or DC Power System Components Removing an AC or DC Power Module Power Module Replacement GuidelinesRemoving and Replacing an AC or DC Power Module Installing an AC or DC Power Module Removing a Chassis from the Equipment RackInstalling a Replacement Chassis in the Equipment Rack Packing a Chassis for ShipmentTechnical Specifications Description Value Table A-3 Cisco ASR 9001 AC Electrical Specifications Parameter Value Minimum Maximum Range NominalRange Minimum Nominal Maximum Part Number Description Typical MaximumPart Number Description Wavelength Fiber Type Distance ITU Grid Part Number Description WavelengthColor Identifier Part Number Description Wavelength ITU Grid Fiber Type Distance XFP-10GLR-OC192SRXFP-10GZR-OC192LR XFP-10G-MM-SRDWDM-XFP-C OL-26701-02 Site Log Appendix B Site Log Numerics IN-2 See EMI EMICwdm LED DwdmACT LinkNebs IN-5IN-6 IN-7 IN-8