Chapter 1 Preparing for Installation
Site Requirement Guidelines
Figure 1-8 ASR 9001 Clearance Requirements for an Enclosed 4-Post Rack Installation
Rear of chassis
6Inches 152.0 mm
Front of chassis
6Inches 152.0 mm
3.25Inches
82.55mm
331929
Temperature and Humidity Guidelines
The operating and nonoperating environmental site requirements are listed in Table
Power Connection Guidelines
You can configure the router with either an
| Cisco ASR 9001 and Cisco ASR |