Cisco Systems ASR9001s, 9001S manual Installing a Cable Management Bracket

Page 60

Chapter 3 Installing Modules and Cables in the Chassis

Cable Management

Cable Management Bracket

The Cisco ASR 9001 Router provides a cable management bracket at the middle of the router chassis. Figure 3-8shows a typical cable routing for the Cisco ASR 9001 Router.

Figure 3-8 Example Cable Routing through Cisco ASR 9001 Router Cable Management Brackets

332699

Note When shipped, the cable-management bracket is not attached to the router chassis. You must attach the cable-management bracket to the chassis before you insert the cables into the line card ports.

Caution Do not use the cable-management bracket as a handle to pull out or push in the line card. The cable-management bracket is designed to hold the interface cables and may break if you use the bracket to push, pull, or carry the line card after it is removed from the router.

Installing a Cable Management Bracket

To install a cable-management bracket, follow these steps:

Step 1 Attach an ESD-preventive wrist or ankle strap and follow its instructions for use.

Step 2 Position the cable-management bracket over the front of the chassis front panel.

 

Cisco ASR 9001 and Cisco ASR 9001-S Routers Hardware Installation Guide

3-14

OL-26701-02

Image 60
Contents Americas Headquarters Text Part Number OL-26701-02Page Cisco ASR 9001 Router Cable Management Status LEDs Site Log B-1 Changes to This Document AudiencePurpose Revision Date Change SummaryDocument Organization Document ConventionsObtaining Documentation and Submitting a Service Request OL-26701-02 Preparing for Installation Safety Guidelines General Safety GuidelinesCompliance and Safety Information Laser SafetyEnergy Hazard Preventing Electrostatic Discharge Damage Lifting GuidelinesSite Layout and Equipment Dimensions Site Requirement GuidelinesRear of chassis Site Wiring Guidelines Chassis Air Flow GuidelinesRack-Mounting and Air Flow Clearance Guidelines Air exhaust Room airTelco 2-Post Rack Equipment Rack TypesOpen 4-Post Rack Enclosed Rack with Perforated SidesAir Flow Guidelines for Enclosed Rack Installation Temperature and Humidity Guidelines Power Connection GuidelinesAC Powered Routers AC Power Cord IllustrationsAC Power Cord CAB-AC 12 AC Power Cord CAB-ACI 15 AC Power Cord CAB-ACU DC Powered Router 18 AC Power Cord CAB-9K10A-EU20 DC Power Cable Terminal Block 331933 Nebs Supplemental Unit Bonding and Grounding Guidelines Cisco ASR 9001 Router Port Connection Guidelines 23 Cisco ASR 9001 Router Front Panel PortsPort Name DescriptionMLT3 SMBConsole Port Signals Signal Input/Output DescriptionConsole Port and Auxiliary Port Connection Guidelines Auxiliary Port Signals 10Base-T, 100Base-TX Signal 1000Base-T SignalManagement LAN Ports Connection Guidelines Management LAN Port LED Indicators Management LAN RJ-45 CablingSync Port LED Indicators Sync Ports Connection GuidelinesPin Signal RP External USB PortOL-26701-02 Pre-Installation Considerations and Requirements Installation OverviewUnpacking the Cisco ASR 9001 Router Required Tools and EquipmentPositioning the Router Verifying Rack Dimensions Installing the Chassis in a 2-Post RackRack-Mounting the Router Chassis Page Correct Lifting Positions Installing the Chassis in a 4-post Rack Supplemental Bonding and Grounding ConnectionsNebs Bonding and Grounding for the Cisco ASR 9001 Router Installing Modules and Cables in the Chassis Fixed 4x10-Gigabit Ethernet PortsModular Port Adapters Port Gigabit Ethernet Modular Port AdapterPort 10 Gigabit Ethernet Modular Port Adapter LED Label Color State MeaningStatus 4-Port 10 Gigabit Ethernet Modular Port Adapter Installing and Removing Modular Port Adapters 2-Port 10 Gigabit Ethernet Modular Port AdapterHandling Modular Port Adapters MPAs Online Insertion and RemovalModular Port Adapter MPA Installation and Removal GE MPAOptical Device Installation and Removal Checking the InstallationCleaning Optical Devices Verifying the InstallationPage Using the ping Command to Verify Network Connectivity Command Type of Information ProvidedInstalling and Removing SFP Modules Installing and Removing XFP ModulesInstalling a Cable Management Tray Cable ManagementCable Management Tray Cable-Management Tray Installation and Removal Removing a Cable-Management TrayInstalling a Cable Management Bracket Cable Management BracketCable-Management Bracket Installation and Removal Removing a Cable-Management BracketConnecting Route Processor Cables 10 RP Console and Auxiliary Port ConnectionsConnecting to the RP Console Port Connecting to the RP Auxiliary PortConnecting to the RP Ethernet Management Ports Connecting Power to the Router Connecting Power to an AC-Powered RouterProceed to the Powering on the Router section on Connecting Power to a DC-Powered Router Negative to negativePowering on the Router 12 Typical Power Connections for a Single DC Power ModuleOL-26701-02 Troubleshooting Overview Troubleshooting Using a Subsystem ApproachIdentifying Startup Issues Normal Router Startup SequenceTroubleshooting the Power Subsystem Troubleshooting the AC-Input Power SubsystemPower Module Status Indicators LEDTroubleshooting the DC-Input Power Subsystem Troubleshooting a DC Power ModuleAdditional Power Subsystem Troubleshooting Information Obtaining Temperature and Environmental InformationHardware and Software Identification Hardware IDTroubleshooting the Installation Troubleshooting the Power Distribution System 8VLGTNGTroubleshooting the Route Processor Subsystem Route Processor OverviewRP Front Panel Indicators Indicator LabelColor Description Ethernet Ports and Status LEDs Auxiliary and Console PortsTroubleshooting the Line Card Monitoring Critical, Major, and Minor Alarm StatusInitial Boot Process Status LEDsConfiguring and Troubleshooting Line Card Interfaces Configuration ParametersParameter Configuration File Entry Default Value MTUUsing Configuration Commands Basic Line Card ConfigurationLine Card Interface Address Verifying the Transceiver Modules PID XFP-10G-MM-SR Advanced Line Card Troubleshooting Show logging Show diag slot Show context location slotTroubleshooting the Cooling Subsystem Power Module FansFan Tray Operation Over-temperature Conditions Isolating Cooling Subsystem ProblemsOL-26701-02 Prerequisites and Preparation Field Replaceable UnitsPowering Off the Router Removing and Replacing the Fan TrayRemoving and Replacing AC or DC Power System Components Power Module Replacement Guidelines Removing and Replacing an AC or DC Power ModuleRemoving an AC or DC Power Module Installing an AC or DC Power Module Removing a Chassis from the Equipment RackInstalling a Replacement Chassis in the Equipment Rack Packing a Chassis for ShipmentTechnical Specifications Description Value Table A-3 Cisco ASR 9001 AC Electrical Specifications Minimum Maximum Range Nominal Range Minimum Nominal MaximumParameter Value Typical Maximum Part Number Description Wavelength Fiber Type DistancePart Number Description Part Number Description Wavelength Color IdentifierITU Grid Part Number Description Wavelength ITU Grid Fiber Type Distance XFP-10GLR-OC192SRXFP-10GZR-OC192LR XFP-10G-MM-SRDWDM-XFP-C OL-26701-02 Site Log Appendix B Site Log Numerics IN-2 See EMI EMICwdm LED DwdmACT LinkNebs IN-5IN-6 IN-7 IN-8