Cisco Systems ASR9001s, 9001S manual

Page 55

Chapter 3 Installing Modules and Cables in the Chassis

Installing and Removing Modular Port Adapters

When the system has reinitialized all interfaces, the modular port adapter (MPA) STATUS LEDs should be on (green). The port LEDs (C/A and A/L) may be on (green), depending on your connections and configuration.

Use this procedure to verify that a modular port adapter (MPA) is installed correctly:

Step 1 Observe the console display messages and verify that the system discovers the modular line card (MLC), while the system reinitializes each interface, thus:

As a modular port adapter (MPA) is initialized, the STATUS LED will first be amber, indicating that power is on. When the modular port adapter card (MPA) is active, the STATUS LED will illuminate green.

Step 2 When the modular port adapter (MPA) STATUS LEDs are green, all associated interfaces are configurable.

If a modular port adapter (MPA) is replaced with a module of the same type (as in an OIR or hardware swap), the previous configuration is reinstated when the modular port adapter (MPA) becomes active.

If a modular port adapter (MPA) has not been previously installed in the same slot or subslot, then the configuration for all associated interfaces is empty.

Note New interfaces are not made available until you configure them.

Step 3 If the modular port adapters (MPAs) do not become active within three minutes, refer to the system console messages. If there is no indication that a field-programmable device (FPD) upgrade is underway, see Troubleshooting the Installation.

Using show Commands to Verify Modular Port Adapter (MPA) Status

This procedure uses show commands to verify that the new modular port adapters (MPAs) are configured and operating correctly.

Step 1 Use the show running-configcommand to display the system configuration. Verify that the configuration includes the new modular port adapter (MPA) interfaces.

Step 2 Use the show diag command to display information about the installed modular line cards (MLCs).

Step 3 Use the show hw-module fpd location <rack/slot/subslot> command to verify the FPD version information of the modular port adapters (MPAs) installed in the system.

Note If a modular port adapter (MPA) does not meet the minimum version required, the FPD may need to be updated. Refer to Cisco ASR 9000 Series Aggregation Services Router System Management Configuration Guide for instructions. If the update fails, the failing module is powered down and an error message displays on the system console.

Step 4 Use the show platform command to check the state of all boards in the chassis, including the modular line card (MLC) and the modular port adapters (MPAs).

The modular port adapter (MPA) state should be “OK” and the modular line card (MLC) card state should be “IOS XR RUN” in the show platform command output.

Cisco ASR 9001 and Cisco ASR 9001-S Routers Hardware Installation Guide

 

OL-26701-02

3-9

 

 

 

Image 55
Contents Text Part Number OL-26701-02 Americas HeadquartersPage Cisco ASR 9001 Router Cable Management Status LEDs Site Log B-1 Revision Date Change Summary Changes to This DocumentAudience PurposeDocument Conventions Document OrganizationObtaining Documentation and Submitting a Service Request OL-26701-02 Preparing for Installation General Safety Guidelines Safety GuidelinesLaser Safety Compliance and Safety InformationEnergy Hazard Lifting Guidelines Preventing Electrostatic Discharge DamageSite Requirement Guidelines Site Layout and Equipment DimensionsRear of chassis Chassis Air Flow Guidelines Site Wiring GuidelinesAir exhaust Room air Rack-Mounting and Air Flow Clearance GuidelinesEquipment Rack Types Telco 2-Post RackEnclosed Rack with Perforated Sides Open 4-Post RackAir Flow Guidelines for Enclosed Rack Installation Power Connection Guidelines Temperature and Humidity GuidelinesAC Power Cord Illustrations AC Powered RoutersAC Power Cord CAB-AC 12 AC Power Cord CAB-ACI 15 AC Power Cord CAB-ACU 18 AC Power Cord CAB-9K10A-EU DC Powered Router20 DC Power Cable Terminal Block 331933 Nebs Supplemental Unit Bonding and Grounding Guidelines 23 Cisco ASR 9001 Router Front Panel Ports Cisco ASR 9001 Router Port Connection GuidelinesSMB Port NameDescription MLT3Signal Input/Output Description Console Port SignalsConsole Port and Auxiliary Port Connection Guidelines 10Base-T, 100Base-TX Signal 1000Base-T Signal Auxiliary Port SignalsManagement LAN Ports Connection Guidelines Management LAN RJ-45 Cabling Management LAN Port LED IndicatorsSync Ports Connection Guidelines Sync Port LED IndicatorsRP External USB Port Pin SignalOL-26701-02 Installation Overview Pre-Installation Considerations and RequirementsRequired Tools and Equipment Unpacking the Cisco ASR 9001 RouterPositioning the Router Installing the Chassis in a 2-Post Rack Verifying Rack DimensionsRack-Mounting the Router Chassis Page Correct Lifting Positions Supplemental Bonding and Grounding Connections Installing the Chassis in a 4-post RackNebs Bonding and Grounding for the Cisco ASR 9001 Router Fixed 4x10-Gigabit Ethernet Ports Installing Modules and Cables in the ChassisPort Gigabit Ethernet Modular Port Adapter Modular Port AdaptersLED Label Color State Meaning Port 10 Gigabit Ethernet Modular Port AdapterStatus 4-Port 10 Gigabit Ethernet Modular Port Adapter 2-Port 10 Gigabit Ethernet Modular Port Adapter Installing and Removing Modular Port AdaptersOnline Insertion and Removal Handling Modular Port Adapters MPAsGE MPA Modular Port Adapter MPA Installation and RemovalVerifying the Installation Optical Device Installation and RemovalChecking the Installation Cleaning Optical DevicesPage Command Type of Information Provided Using the ping Command to Verify Network ConnectivityInstalling and Removing XFP Modules Installing and Removing SFP ModulesCable Management Installing a Cable Management TrayCable Management Tray Removing a Cable-Management Tray Cable-Management Tray Installation and RemovalCable Management Bracket Installing a Cable Management BracketRemoving a Cable-Management Bracket Cable-Management Bracket Installation and Removal10 RP Console and Auxiliary Port Connections Connecting Route Processor CablesConnecting to the RP Auxiliary Port Connecting to the RP Console PortConnecting to the RP Ethernet Management Ports Connecting Power to an AC-Powered Router Connecting Power to the RouterProceed to the Powering on the Router section on Negative to negative Connecting Power to a DC-Powered Router12 Typical Power Connections for a Single DC Power Module Powering on the RouterOL-26701-02 Troubleshooting Using a Subsystem Approach Troubleshooting OverviewNormal Router Startup Sequence Identifying Startup IssuesTroubleshooting the AC-Input Power Subsystem Troubleshooting the Power SubsystemLED Power Module Status IndicatorsTroubleshooting a DC Power Module Troubleshooting the DC-Input Power SubsystemHardware ID Additional Power Subsystem Troubleshooting InformationObtaining Temperature and Environmental Information Hardware and Software IdentificationTroubleshooting the Installation 8VLGTNG Troubleshooting the Power Distribution SystemRoute Processor Overview Troubleshooting the Route Processor SubsystemIndicator Label RP Front Panel IndicatorsColor Description Auxiliary and Console Ports Ethernet Ports and Status LEDsStatus LEDs Troubleshooting the Line CardMonitoring Critical, Major, and Minor Alarm Status Initial Boot ProcessMTU Configuring and Troubleshooting Line Card InterfacesConfiguration Parameters Parameter Configuration File Entry Default ValueBasic Line Card Configuration Using Configuration CommandsLine Card Interface Address Verifying the Transceiver Modules PID XFP-10G-MM-SR Show logging Show diag slot Show context location slot Advanced Line Card TroubleshootingPower Module Fans Troubleshooting the Cooling SubsystemFan Tray Operation Isolating Cooling Subsystem Problems Over-temperature ConditionsOL-26701-02 Field Replaceable Units Prerequisites and PreparationRemoving and Replacing the Fan Tray Powering Off the RouterRemoving and Replacing AC or DC Power System Components Removing and Replacing an AC or DC Power Module Power Module Replacement GuidelinesRemoving an AC or DC Power Module Removing a Chassis from the Equipment Rack Installing an AC or DC Power ModulePacking a Chassis for Shipment Installing a Replacement Chassis in the Equipment RackTechnical Specifications Description Value Table A-3 Cisco ASR 9001 AC Electrical Specifications Range Minimum Nominal Maximum Minimum Maximum Range NominalParameter Value Part Number Description Wavelength Fiber Type Distance Typical MaximumPart Number Description Color Identifier Part Number Description WavelengthITU Grid Part Number Description Wavelength ITU Grid XFP-10G-MM-SR Fiber Type DistanceXFP-10GLR-OC192SR XFP-10GZR-OC192LRDWDM-XFP-C OL-26701-02 Site Log Appendix B Site Log Numerics IN-2 EMI See EMILink CwdmLED Dwdm ACTIN-5 NebsIN-6 IN-7 IN-8