Cisco Systems ASR9001s, 9001S manual Telco 2-Post Rack, Equipment Rack Types

Page 19

Chapter 1 Preparing for Installation

Site Requirement Guidelines

Figure 1-6 Equipment Rack Types

a

b

243453

c

a

Telco-style rack

b

Free-standing, 4-post open

c

Free-standing enclosed rack

 

 

 

rack with two mounting

 

with perforated sides and

 

 

 

posts in the front, two

 

two mounting posts in the

 

 

 

mounting posts in the back

 

front

 

 

 

or along each side

 

 

 

 

 

 

 

 

Telco 2-Post Rack

Item a in Figure 1-6shows a telco-style rack. The telco-style rack is an open frame consisting of two posts tied together by a cross-bar at the top and a floor-stand at the bottom.

This type of rack is usually secured to the floor, and sometimes to an overhead structure or wall for additional stability. The router chassis can be installed in the telco-style rack only in a front-mounted position.

In the front-mounted position, you secure the chassis rack-mounting brackets directly to the rack posts (see Figure 1-7as an example of a Cisco ASR 9001 Router rack mounting). Two rear mounting brackets are provided for mounting the Cisco ASR 9001 Router in a 2-post rack.

Note The mounting brackets on the Cisco ASR 9001 Router chassis have a pair of holes at the top and bottom of each bracket; the remaining openings in the brackets are slots. If the Cisco ASR 9001 Router is to be mounted in a 2-post 19-inch rack, you must first use the holes to locate and position the brackets on the rack. Insert screws through the bracket holes into the rack before inserting screws through the bracket slots.

Cisco ASR 9001 and Cisco ASR 9001-S Routers Hardware Installation Guide

 

OL-26701-02

1-9

 

 

 

Image 19
Contents Text Part Number OL-26701-02 Americas HeadquartersPage Cisco ASR 9001 Router Cable Management Status LEDs Site Log B-1 Revision Date Change Summary Changes to This DocumentAudience PurposeDocument Conventions Document OrganizationObtaining Documentation and Submitting a Service Request OL-26701-02 Preparing for Installation General Safety Guidelines Safety GuidelinesLaser Safety Compliance and Safety InformationEnergy Hazard Lifting Guidelines Preventing Electrostatic Discharge DamageSite Requirement Guidelines Site Layout and Equipment DimensionsRear of chassis Chassis Air Flow Guidelines Site Wiring GuidelinesAir exhaust Room air Rack-Mounting and Air Flow Clearance GuidelinesEquipment Rack Types Telco 2-Post RackEnclosed Rack with Perforated Sides Open 4-Post RackAir Flow Guidelines for Enclosed Rack Installation Power Connection Guidelines Temperature and Humidity GuidelinesAC Power Cord Illustrations AC Powered RoutersAC Power Cord CAB-AC 12 AC Power Cord CAB-ACI 15 AC Power Cord CAB-ACU 18 AC Power Cord CAB-9K10A-EU DC Powered Router20 DC Power Cable Terminal Block 331933 Nebs Supplemental Unit Bonding and Grounding Guidelines 23 Cisco ASR 9001 Router Front Panel Ports Cisco ASR 9001 Router Port Connection GuidelinesSMB Port NameDescription MLT3Signal Input/Output Description Console Port SignalsConsole Port and Auxiliary Port Connection Guidelines 10Base-T, 100Base-TX Signal 1000Base-T Signal Auxiliary Port SignalsManagement LAN Ports Connection Guidelines Management LAN RJ-45 Cabling Management LAN Port LED IndicatorsSync Ports Connection Guidelines Sync Port LED IndicatorsRP External USB Port Pin SignalOL-26701-02 Installation Overview Pre-Installation Considerations and RequirementsRequired Tools and Equipment Unpacking the Cisco ASR 9001 RouterPositioning the Router Installing the Chassis in a 2-Post Rack Verifying Rack DimensionsRack-Mounting the Router Chassis Page Correct Lifting Positions Supplemental Bonding and Grounding Connections Installing the Chassis in a 4-post RackNebs Bonding and Grounding for the Cisco ASR 9001 Router Fixed 4x10-Gigabit Ethernet Ports Installing Modules and Cables in the ChassisPort Gigabit Ethernet Modular Port Adapter Modular Port AdaptersLED Label Color State Meaning Port 10 Gigabit Ethernet Modular Port AdapterStatus 4-Port 10 Gigabit Ethernet Modular Port Adapter 2-Port 10 Gigabit Ethernet Modular Port Adapter Installing and Removing Modular Port AdaptersOnline Insertion and Removal Handling Modular Port Adapters MPAsGE MPA Modular Port Adapter MPA Installation and RemovalVerifying the Installation Optical Device Installation and RemovalChecking the Installation Cleaning Optical DevicesPage Command Type of Information Provided Using the ping Command to Verify Network ConnectivityInstalling and Removing XFP Modules Installing and Removing SFP ModulesCable Management Installing a Cable Management TrayCable Management Tray Removing a Cable-Management Tray Cable-Management Tray Installation and RemovalCable Management Bracket Installing a Cable Management BracketRemoving a Cable-Management Bracket Cable-Management Bracket Installation and Removal10 RP Console and Auxiliary Port Connections Connecting Route Processor CablesConnecting to the RP Auxiliary Port Connecting to the RP Console PortConnecting to the RP Ethernet Management Ports Connecting Power to an AC-Powered Router Connecting Power to the RouterProceed to the Powering on the Router section on Negative to negative Connecting Power to a DC-Powered Router12 Typical Power Connections for a Single DC Power Module Powering on the RouterOL-26701-02 Troubleshooting Using a Subsystem Approach Troubleshooting OverviewNormal Router Startup Sequence Identifying Startup IssuesTroubleshooting the AC-Input Power Subsystem Troubleshooting the Power SubsystemLED Power Module Status IndicatorsTroubleshooting a DC Power Module Troubleshooting the DC-Input Power SubsystemHardware ID Additional Power Subsystem Troubleshooting InformationObtaining Temperature and Environmental Information Hardware and Software IdentificationTroubleshooting the Installation 8VLGTNG Troubleshooting the Power Distribution SystemRoute Processor Overview Troubleshooting the Route Processor SubsystemIndicator Label RP Front Panel IndicatorsColor Description Auxiliary and Console Ports Ethernet Ports and Status LEDsStatus LEDs Troubleshooting the Line CardMonitoring Critical, Major, and Minor Alarm Status Initial Boot ProcessMTU Configuring and Troubleshooting Line Card InterfacesConfiguration Parameters Parameter Configuration File Entry Default ValueBasic Line Card Configuration Using Configuration CommandsLine Card Interface Address Verifying the Transceiver Modules PID XFP-10G-MM-SR Show logging Show diag slot Show context location slot Advanced Line Card TroubleshootingPower Module Fans Troubleshooting the Cooling SubsystemFan Tray Operation Isolating Cooling Subsystem Problems Over-temperature ConditionsOL-26701-02 Field Replaceable Units Prerequisites and PreparationRemoving and Replacing the Fan Tray Powering Off the RouterRemoving and Replacing AC or DC Power System Components Removing and Replacing an AC or DC Power Module Power Module Replacement GuidelinesRemoving an AC or DC Power Module Removing a Chassis from the Equipment Rack Installing an AC or DC Power ModulePacking a Chassis for Shipment Installing a Replacement Chassis in the Equipment RackTechnical Specifications Description Value Table A-3 Cisco ASR 9001 AC Electrical Specifications Range Minimum Nominal Maximum Minimum Maximum Range NominalParameter Value Part Number Description Wavelength Fiber Type Distance Typical MaximumPart Number Description Color Identifier Part Number Description WavelengthITU Grid Part Number Description Wavelength ITU Grid XFP-10G-MM-SR Fiber Type DistanceXFP-10GLR-OC192SR XFP-10GZR-OC192LRDWDM-XFP-C OL-26701-02 Site Log Appendix B Site Log Numerics IN-2 EMI See EMILink CwdmLED Dwdm ACTIN-5 NebsIN-6 IN-7 IN-8