Cisco Systems 9001S Minimum Maximum Range Nominal, Range Minimum Nominal Maximum, Parameter Value

Page 98

Appendix A Technical Specifications

Table A-5lists the AC input voltage range for the AC-powered Cisco ASR 9001 Router (single phase power source).

Table A-5

AC Input Voltage Range

 

 

 

 

 

 

 

 

 

 

 

 

 

Minimum

 

Maximum

 

Range

 

Minimum

Nominal

Nominal

Nominal

Maximum

 

 

 

 

 

 

 

Input Voltage

 

90 VAC

100 VAC

220 VAC

240 VAC

264 VAC

 

 

 

 

 

 

 

Line Frequency

 

47 Hz

50 Hz

50/60 Hz

60 Hz

63 Hz

 

 

 

 

 

 

 

Table A-6lists the DC input voltage range for the DC-powered Cisco ASR 9001 Router.

Table A-6

DC Input Voltage Range

 

 

 

 

 

 

 

Range

 

Minimum

Nominal

Maximum

 

 

 

 

 

Input Voltage

 

–40 VDC

–48 VDC

–72 VDC

 

 

 

 

 

Table A-7lists the DC output tolerances for either AC or DC power modules.

Table A-7 DC Output Levels for ASR 9001 Power System

Parameter

 

 

Value

 

 

 

 

 

Voltage

 

 

 

 

 

 

 

 

 

Maximum

 

 

12.6 VDC

 

 

 

 

 

Nominal

 

 

12 VDC

 

 

 

 

 

Minimum

 

 

11.4 VDC

 

 

 

 

 

Power

 

 

 

 

 

 

 

 

Minimum (one power module)

 

750 W

 

 

 

 

Maximum (two 750 W power modules)

1500 W

 

 

 

 

Table A-8lists the RP port specifications.

 

 

Table A-8

RP Port Specifications

 

 

 

 

 

 

 

Description

 

Value

 

 

 

 

 

 

Console port

 

EIA/TIA-232 RJ-45 interface, 115200 Baud, 8 data, no

 

 

parity, 1 stop bit with software handshake (default)

 

 

 

 

Auxiliary port

 

EIA/TIA-232 RJ-45 interface, 115200 Baud, 8 data, no

 

 

parity, 1 stop bit with software handshake (default)

 

 

 

Management ports (0, 1)

Triple-speed (10M/100M/1000M) RJ-45

 

 

 

Sync ports (0, 1)

Can be configured as one of the following:

 

 

BITS (Building Integrated Timing System) port

 

 

J.211 or UTI (Universal Timing Interface) port

 

 

 

 

 

Cisco ASR 9001 and Cisco ASR 9001-S Routers Hardware Installation Guide

 

A-4

OL-26701-02

 

 

 

Image 98
Contents Americas Headquarters Text Part Number OL-26701-02Page Cisco ASR 9001 Router Cable Management Status LEDs Site Log B-1 Purpose Changes to This DocumentAudience Revision Date Change SummaryDocument Organization Document ConventionsObtaining Documentation and Submitting a Service Request OL-26701-02 Preparing for Installation Safety Guidelines General Safety GuidelinesEnergy Hazard Compliance and Safety InformationLaser Safety Preventing Electrostatic Discharge Damage Lifting GuidelinesSite Layout and Equipment Dimensions Site Requirement GuidelinesRear of chassis Site Wiring Guidelines Chassis Air Flow GuidelinesRack-Mounting and Air Flow Clearance Guidelines Air exhaust Room airTelco 2-Post Rack Equipment Rack TypesOpen 4-Post Rack Enclosed Rack with Perforated SidesAir Flow Guidelines for Enclosed Rack Installation Temperature and Humidity Guidelines Power Connection GuidelinesAC Powered Routers AC Power Cord IllustrationsAC Power Cord CAB-AC 12 AC Power Cord CAB-ACI 15 AC Power Cord CAB-ACU DC Powered Router 18 AC Power Cord CAB-9K10A-EU20 DC Power Cable Terminal Block 331933 Nebs Supplemental Unit Bonding and Grounding Guidelines Cisco ASR 9001 Router Port Connection Guidelines 23 Cisco ASR 9001 Router Front Panel PortsMLT3 Port NameDescription SMBConsole Port and Auxiliary Port Connection Guidelines Console Port SignalsSignal Input/Output Description Management LAN Ports Connection Guidelines Auxiliary Port Signals10Base-T, 100Base-TX Signal 1000Base-T Signal Management LAN Port LED Indicators Management LAN RJ-45 CablingSync Port LED Indicators Sync Ports Connection GuidelinesPin Signal RP External USB PortOL-26701-02 Pre-Installation Considerations and Requirements Installation OverviewUnpacking the Cisco ASR 9001 Router Required Tools and EquipmentPositioning the Router Rack-Mounting the Router Chassis Verifying Rack DimensionsInstalling the Chassis in a 2-Post Rack Page Correct Lifting Positions Installing the Chassis in a 4-post Rack Supplemental Bonding and Grounding ConnectionsNebs Bonding and Grounding for the Cisco ASR 9001 Router Installing Modules and Cables in the Chassis Fixed 4x10-Gigabit Ethernet PortsModular Port Adapters Port Gigabit Ethernet Modular Port AdapterStatus Port 10 Gigabit Ethernet Modular Port AdapterLED Label Color State Meaning 4-Port 10 Gigabit Ethernet Modular Port Adapter Installing and Removing Modular Port Adapters 2-Port 10 Gigabit Ethernet Modular Port AdapterHandling Modular Port Adapters MPAs Online Insertion and RemovalModular Port Adapter MPA Installation and Removal GE MPACleaning Optical Devices Optical Device Installation and RemovalChecking the Installation Verifying the InstallationPage Using the ping Command to Verify Network Connectivity Command Type of Information ProvidedInstalling and Removing SFP Modules Installing and Removing XFP ModulesCable Management Tray Installing a Cable Management TrayCable Management Cable-Management Tray Installation and Removal Removing a Cable-Management TrayInstalling a Cable Management Bracket Cable Management BracketCable-Management Bracket Installation and Removal Removing a Cable-Management BracketConnecting Route Processor Cables 10 RP Console and Auxiliary Port ConnectionsConnecting to the RP Ethernet Management Ports Connecting to the RP Console PortConnecting to the RP Auxiliary Port Connecting Power to the Router Connecting Power to an AC-Powered RouterProceed to the Powering on the Router section on Connecting Power to a DC-Powered Router Negative to negativePowering on the Router 12 Typical Power Connections for a Single DC Power ModuleOL-26701-02 Troubleshooting Overview Troubleshooting Using a Subsystem ApproachIdentifying Startup Issues Normal Router Startup SequenceTroubleshooting the Power Subsystem Troubleshooting the AC-Input Power SubsystemPower Module Status Indicators LEDTroubleshooting the DC-Input Power Subsystem Troubleshooting a DC Power ModuleHardware and Software Identification Additional Power Subsystem Troubleshooting InformationObtaining Temperature and Environmental Information Hardware IDTroubleshooting the Installation Troubleshooting the Power Distribution System 8VLGTNGTroubleshooting the Route Processor Subsystem Route Processor OverviewColor Description RP Front Panel IndicatorsIndicator Label Ethernet Ports and Status LEDs Auxiliary and Console PortsInitial Boot Process Troubleshooting the Line CardMonitoring Critical, Major, and Minor Alarm Status Status LEDsParameter Configuration File Entry Default Value Configuring and Troubleshooting Line Card InterfacesConfiguration Parameters MTULine Card Interface Address Using Configuration CommandsBasic Line Card Configuration Verifying the Transceiver Modules PID XFP-10G-MM-SR Advanced Line Card Troubleshooting Show logging Show diag slot Show context location slotFan Tray Operation Troubleshooting the Cooling SubsystemPower Module Fans Over-temperature Conditions Isolating Cooling Subsystem ProblemsOL-26701-02 Prerequisites and Preparation Field Replaceable UnitsPowering Off the Router Removing and Replacing the Fan TrayRemoving and Replacing AC or DC Power System Components Removing an AC or DC Power Module Power Module Replacement GuidelinesRemoving and Replacing an AC or DC Power Module Installing an AC or DC Power Module Removing a Chassis from the Equipment RackInstalling a Replacement Chassis in the Equipment Rack Packing a Chassis for ShipmentTechnical Specifications Description Value Table A-3 Cisco ASR 9001 AC Electrical Specifications Parameter Value Minimum Maximum Range NominalRange Minimum Nominal Maximum Part Number Description Typical MaximumPart Number Description Wavelength Fiber Type Distance ITU Grid Part Number Description WavelengthColor Identifier Part Number Description Wavelength ITU Grid XFP-10GZR-OC192LR Fiber Type DistanceXFP-10GLR-OC192SR XFP-10G-MM-SRDWDM-XFP-C OL-26701-02 Site Log Appendix B Site Log Numerics IN-2 See EMI EMIACT CwdmLED Dwdm LinkNebs IN-5IN-6 IN-7 IN-8