Post Start-Up Check

Post Start-Up Check

Check off steps as completed:

1.Verify that the boiler and heat distribution units or storage tank are filled with water.

2.Confirm that the automatic air vent (if used) was opened two full turns during the venting proce- dure.

3.Verify that air has been purged from the system.

4.Verify that air has been purged from the gas pip- ing, and that the piping has been checked for leaks.

5.Confirm that the proper start-up procedures were followed.

6.Inspect burner to verify flame.

7.Testsafety controls: If boiler is equipped with a low water cut-off or additional safety controls, test for operation as outlined by manufacturer. Burner should be operating and should go off when con- trols are tested. When safety devices are restored, burners should re-ignite after pre-purge time delay.

8.Check to see that the high limit control is set above the design temperature requirements of the system. For multiple zones: Check to make sure the flow is adjusted as required in each zone.

9.Check that the boiler is cycled with the thermostat. Raise the setting on the thermostat to the highest setting and verify that the boiler goes through the normal start-up cycle. Reduce to the lowest set- ting and verify that the boiler goes off.

10.Observe several operating cycles for proper oper- ation.

11.Set the boiler thermostat to desired temperature.

12.Review all instructions shipped with this boiler with owner or maintenance person, return to envelope and give to owner or place the instructions inside front panel on boiler.

OPERATION

Lighting Instructions

1.Before lighting, make sure you have read all of the safety information in this manual.

2.Set the thermostat to the lowest setting.

3.Turn off all electrical power to the appliance.

4.This appliance is equipped with an ignition device which automatically lights the burner. Do not try to light the burner by hand.

5.Turn on main manual gas valve field-installed near gas inlet connection on back of boiler.

6.Wait 5 minutes to clear out any gas. Then smell for gas, especially near the floor. If you then smell gas, STOP! Follow the steps in the safety informa- tion on the front cover of this manual. If you do not smell gas, go to next step.

7.Turn on all electrical power to the appliance.

8.Set thermostat to desired setting. The appliance will operate. The igniter will spark after the pre- purge time delay (15 seconds). The main valve should open. System will try for ignition up to four times (one time on optional single-try ignition mod- ule). If flame is not sensed, lockout will commence.

9.If the appliance will not operate, follow the instruc- tions “To Turn Off Gas ToAppliance,” and call your service technician or gas supplier.

10.If boiler fails to start, verify the following:

a.There are no loose connections or that the service switch is off.

b.High temperature limit switch or manual-reset high limit is not tripped.

c.Thermostat is set above water temperature.

d.Gas is on at the meter and the boiler.

e.Incoming dynamic gas pressure to the gas valve is NOT less than 4.0 in. WC for natural gas or propane gas.

44

Image 44
Contents WHAT TO DO IF YOU SMELL GAS Do not try to light any applianceINSTALLATION & OPERATING INSTRUCTIONS Models 300, 500 & Types H & WPage CONTENTS BEFORE INSTALLATIONGENERAL SAFETY INSTALLATION WIRING DIAGRAM START-UPWARNINGS Pay Attention to These TermsBEFORE INSTALLATION Installations at ElevationProduct Receipt Model IdentificationComponent Locations General InformationGENERAL SAFETY Time/Temperature Relationships in ScaldsINSTALLATION Installation CodesIndoor Installations Outdoor InstallationsCombustion and Ventilation Air Indoor UnitsTable F Vent/Air Inlet Termination Clearances U.S. Installations1Canadian Installations2 U.S. Installations Conventional Combustion Air SupplyCombustion Air Filter Direct VentGeneral Canadian InstallationsWater Piping Relief Valve Installation and Piping Hydronic HeatingTemperature & Pressure Gauge Hydrostatic TestDomestic Hot Water Air-Separation/ExpansionTankThree-WayValves Potable Water and Space Heating Gas Supply Pressure Gas Supply ConnectionGas Supply Electrical Power Connections Field-ConnectedControllers Check the Power SourceMaking the Electrical Connections Field Wiring Connections Wiring the ThermostatWiring the Cascade System Communication Bus Wiring the Outdoor SensorWiring the Indirect Sensor 3.Create a hole to route the communication cables through where the dimples are in the side of the cabinet see Fig. 15, or route the wires to the rear junction box and out of the cabinet Cascade Master Pump and Sensor Wiring General Cascade Follower Pump and Sensor WiringVenting Support of Vent Stack Vent Terminal LocationConfiguration CombustionVertical Venting Category Venting Installation TipsVenting Configurations Combustion Volume of Common VentingModel No Vent SizeHorizontal Through-the-WallDirect Venting CategoryFig. 21 Typical Common Venting Fig. 22 Horizontal Through-the-WallVentingInstallation TerminationModel No Approved IntakesDirect Vent-Vertical Outdoor Installation Freeze ProtectionHigh Limit - Manual Reset High Limit - Auto Reset OptionalControls Ignition Control FunctionsFlow Switch High & Low Gas Pressure Switches OptionalBlocked Vent Switch Low Water Cut-OffOptionalAdjusting the XFyre Setpoint Operating InstructionsBlocked Condensate Drain Sensor User MenuService Mode Status MenuStatus Menu 1 Items Status Menu 2 Items Installer Menu Items continued Installer Menu WIRING DIAGRAM For Your Safety START-UPPre Start-up Pre Start-upCheckBlower Check PreparationStart-Up Safety Inspection Manifold CheckFinishing Follow-UpPost Start-UpCheck OPERATIONLighting Instructions TROUBLESHOOTING XFyre Error CodesHeater Errors Heater FaultsXFyre Fault Text Remedy FLUE / GAS PRESS F01Sensor Resistance Values Temperature SensorsResistance ohms OutdoorMAINTENANCE Suggested Minimum Maintenance SchedulePreventive Maintenance Schedule DailyWeekly Semi-AnnuallyAnnually As RequiredCombustion Chamber Coil Cleaning Instructions NIOSH stated First AidAPPENDIX Inside Air Contamination248 CMR 5.082a1 through LIMITED PARTS WARRANTY XFYRE - TYPE H and W HEAT EXCHANGER WARRANTYMODELS SCOPESTART-UPCHECKLIST FOR THE XFYRE EMISSIONS SETTINGS AND TEST INFORMATIONNominal Factory Recommended Settings GAS SUPPLY DATA
Related manuals
Manual 8 pages 63.38 Kb Manual 8 pages 12.19 Kb

300, 850 specifications

Raypak is a renowned name in the heating industry, particularly known for its high-quality pool and spa heaters. Among their extensive product line, the Raypak 850, 500, 300, 400, and 700 models stand out for their reliability, efficiency, and cutting-edge technologies. Each model is designed to cater to different needs and applications while maintaining Raypak’s commitment to performance.

The Raypak 850 is designed for larger commercial pools or residential setups requiring high output. With a powerful heat exchanger made from copper and bronze, it ensures superior heat transfer and longevity. Its digital control system provides precise temperature regulation, enhancing user experience. Moreover, it features a durable construction with weather-resistant materials, ensuring lasting performance in various environments.

The Raypak 500 model offers a balance between efficiency and compactness. It features eco-friendly technology that reduces energy consumption without sacrificing performance. The integrated thermostat allows users to maintain consistent water temperatures, making it ideal for residential pools. This model is well-regarded for its user-friendly digital display, simplifying operation and monitoring.

For those needing a more moderate capacity, the Raypak 300 is an efficient choice. It combines robust engineering with an easy-to-use interface. Its advanced ignition system improves reliability while minimizing energy waste. The Raypak 300’s compact design allows for easy installation in various spaces, making it an excellent option for smaller pools.

The Raypak 400 heats water quickly and efficiently, making it suitable for both residential pools and spas. It features a high-capacity heating system that ensures optimal performance. With a clear LED display, users can easily monitor their settings, while the integrated diagnostics provide real-time feedback for maintenance and troubleshooting.

Lastly, the Raypak 700 model is known for its versatility and robust performance. It is equipped with advanced safety features, including a high limit switch and water flow detection mechanism, to ensure safe operation. The model's energy-efficient design enhances its eco-friendliness, making it a popular choice among environmentally conscious users.

Collectively, these Raypak models exemplify superior engineering, performance, and user-friendliness. Their innovative features ensure that they meet the varied demands of pool owners while providing reliable heating solutions for leisure and relaxation. Whether for commercial or residential use, the Raypak 850, 500, 300, 400, and 700 offer unmatched quality and efficiency.