Slant/Fin J-390 installation instructions Installation and Operating Instructions

Page 1

This manual must be left with owner and should be hung on or adjacent to the boiler for reference.

DIRECT-VENT SEALED COMBUSTION CONDENSING BOILER HOT WATER MODEL J-390

GAS-FIRED BOILER FOR NATURAL GAS

INSTALLATION AND OPERATING INSTRUCTIONS

TABLE OF CONTENTS

 

Boiler Dimensions and Rating

2

Identification of Parts

3

Installation Requirements

4

Contamination Prevention

5

Venting Application

5

Boiler Room Air Supply and Ventilation

5

Flue gas Venting Requirements

6

Additional Installation Requirements for Massachusetts

6

Vent Material

6

Air Intake Material

6

Vent and Air Intake Restrictions

7

Non-Direct Vent Installation

8

Sidewall Venting, Non-Direct Vent

8

Vent Termination Location and Clearance

8

Non-Direct Vent Vertical Venting

8

Direct Vent Installation

8

Sidewall Venting, Direct Vent

8

Vent/Air Intake Termination Installation

14

Direct Vent, Venting and Air Intake through a Roof

15

Venting and Air Intake Regular Inspection

16

Condensate Removal System

16

Gas Piping

16

Electrical Wiring

17

Wiring Diagram

18

Single and Multi Zoning

21

Water Piping

24

Operating Instructions

30

Boiler Control Display

30

Boiler Control

30

Sequence of Operation

36

Gas Input Rate Adjustment

37

Safety Check

38

Care and Maintenance

41

General Troubleshooting Guide

42

IMPORTANT

READ ALL OF THE FOLLOWING WARNINGS AND STATEMENTS BEFORE READING THE INSTALLATION INSTRUCTIONS

The installation must conform to the requirements of the authority having jurisdiction or, in the absence of such requirements, to the National Fuel Gas Code, ANSI Z223.1-latest edition. The installation must also conform to the additional requirements in this Slant/Fin Instruction Book.

In addition where required by the authority having juris- diction, the installation must conform to American Society of Mechanical Engineers Safety Code for Controls and Safety Devices for Automatically Fired Boilers, No. CSD-1.

WARNING

This boiler, gas piping and accessories must be installed, connected, serviced and repaired by a trained, experienced service technician, familiar with all precautions required for gas-fired equipment and licensed or otherwise qualified, in compliance with the authority having jurisdiction.

WARNING

The venting system of this boiler is under positive pressure. Leakage from this system can be hazardous and if not avoided can result in death or serious injury. In addition to the recom- mendations within this manual and the User’s Information Manual, the venting system, from the flue collector to the out- door discharge, must be carefully checked annually by a quali- fied service agency.

Heating Contractor

Boiler Model Number

Address

Boiler Serial Number

Phone Number

Installation Date

Printed in U.S.A. 708

Part No. 83-5736Publication No. J-40

Image 1
Contents Installation and Operating Instructions Jaguar J-390 Boiler Ratings and DimensionsLocation and identification of parts Location and Identification of PartsBoiler Location SafetyBoiler Foundation Minimum Clearances from Combustible ConstructionsDirect Vent Installation NON-DIRECT Vent InstallationContamination Prevention Products to AvoidVent and AIR Intake Materials Flue GAS Venting RequirementsVent and AIR Intake Restrictions PVC/CPVC Pipe General Assembly MethodSidewall Venting NON-DIRECT Vent Venting InstallationVent Termination Location and Clearances NON-DIRECT Vent Vertical Venting10 MAX Jaguar J-390 NON-DIRECT VENT, Sidewall VentingFT. MIN Jaguar J-390 NON-DIRECT VENT, Venting Through a RoofFT. MIN Thick Wall Jaguar J-390 Direct VENT, Sidewall VentingDIA PVC/CPVC Pipe for Vent Combustion Screw Jaguar Model J-390 FT. MIN Direct Vent Venting and AIR Intake Through a RoofCondensate Removal System Venting and AIR Intake System Regular InspectionCommonwealth of Massachusetts Special Requirement GAS PipingSpace Heating Thermostats Electrical WiringDomestic HOT Water Tank Thermostat Outdoor AIR Sensor101112 Boiler Control 120V 3 4 5 6 7 3 4 5 6 7 Thermostat Water Piping Water Outlet Piping Tank Piping JaguarFeet w.c Zoning with circulators Zoning with zone valves Piping a heating-cooling system to the boiler and a chiller Viewing and changing system setting View and Changing TemperaturesOperating Instructions Filling and Venting Water Systems Before Firing BOILER, make these checksBoiler Operation Status Jaguar Boiler Display BoardIf outdoor sensor is used Viewing and Changing TemperaturesBoiler model selection, value is 5 for model J-390 Water III. Initial Start Safety InformationInstructions To Turn OFF GAS to ApplianceJaguar Model J-390 Sequence of Operation IV. Check Combustion and Fuel Input Rate Gas valve adjustmentControl Safety Shutdown test Safety CheckVI. Diagnostic Error Codes Check for gas leaks19, 42 Going to the sensor, or replace the sensor. If no sen General Maintenance Care and MaintenanceIII. Cleaning If Replacement Parts are NeededGeneral Troubleshooting Guide for Service Personnel Jaguar Model J-390 SLANT/FIN CORPORATION, Greenvale, N.Y Phone 516