Slant/Fin J-390 Location and Identification of Parts, Location and identification of parts

Page 3

Jaguar Model J-390

3

LOCATION AND IDENTIFICATION OF PARTS

4" AIR INTAKE CONNECTION

FIELD WIRING

TERMINALS (24V)

BOILER CONTROL

GAS VALVE

HEAT EXCHANGER

ENCLOSURE FRONT

COVER LATCH

SPARK ELECTRODE

4" VENT CONNECTION

 

FIELD WIRING

 

TERMINALS (120V)

FIELD WIRING BX CONNECTORS

 

TRANFORMER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FLUE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SAMPLE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PORT

 

 

 

 

CONTROL PANEL

DOOR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONTROL BOARD COVER

WATER SUPPLY SENSOR AND

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WATER HIGH LIMIT

FLUE SAMPLE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONTROL PANEL

 

PORT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COMBUSTION

 

WATER SUPPLY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BLOWER

 

FLUE SENSOR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WATER RETURN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SENSOR

(IGNITER)

WINDOW (SIGHT GLASS)

HEAT EXCHANGER

HEAT EXCHANGER ENCLOSURE FRONT COVER LATCH

VENTURI

FLUE PIPE

GAS VALVE

HEAT EXCHANGER ENCLOSURE FRONT COVER

BOILER CONDENSATE TRAP

INSTALL MANUAL MAIN SHUTOFF VALVE 5' ABOVE FLOOR, WHEN RQUIRET BY LOCAL CODE

GAS SUPPLY

VALVE

3" MIN

SEDIMENT TRAP (REQUIET)

WATER RETURN

VENTING

CONDENSATE TRAP

FRONT (INTERIOR)

RIGHT SIDE (INTERIOR)

 

Figure 2. Location and identification of parts

Image 3
Contents Installation and Operating Instructions Jaguar J-390 Boiler Ratings and DimensionsLocation and identification of parts Location and Identification of PartsMinimum Clearances from Combustible Constructions SafetyBoiler Location Boiler FoundationProducts to Avoid NON-DIRECT Vent InstallationDirect Vent Installation Contamination PreventionVent and AIR Intake Materials Flue GAS Venting RequirementsVent and AIR Intake Restrictions PVC/CPVC Pipe General Assembly MethodNON-DIRECT Vent Vertical Venting Venting InstallationSidewall Venting NON-DIRECT Vent Vent Termination Location and Clearances10 MAX Jaguar J-390 NON-DIRECT VENT, Sidewall VentingFT. MIN Jaguar J-390 NON-DIRECT VENT, Venting Through a RoofFT. MIN Thick Wall Jaguar J-390 Direct VENT, Sidewall VentingDIA PVC/CPVC Pipe for Vent Combustion Screw Jaguar Model J-390 FT. MIN Direct Vent Venting and AIR Intake Through a RoofGAS Piping Venting and AIR Intake System Regular InspectionCondensate Removal System Commonwealth of Massachusetts Special RequirementOutdoor AIR Sensor Electrical WiringSpace Heating Thermostats Domestic HOT Water Tank Thermostat101112 Boiler Control 120V 3 4 5 6 7 3 4 5 6 7 Thermostat Water Piping Water Outlet Piping Jaguar Tank PipingFeet w.c Zoning with circulators Zoning with zone valves Piping a heating-cooling system to the boiler and a chiller Before Firing BOILER, make these checks View and Changing TemperaturesViewing and changing system setting Operating Instructions Filling and Venting Water SystemsBoiler Operation Status Jaguar Boiler Display BoardIf outdoor sensor is used Viewing and Changing TemperaturesBoiler model selection, value is 5 for model J-390 Water To Turn OFF GAS to Appliance Safety InformationIII. Initial Start InstructionsJaguar Model J-390 Sequence of Operation IV. Check Combustion and Fuel Input Rate Gas valve adjustmentCheck for gas leaks Safety CheckControl Safety Shutdown test VI. Diagnostic Error Codes19, 42 Going to the sensor, or replace the sensor. If no sen If Replacement Parts are Needed Care and MaintenanceGeneral Maintenance III. CleaningGeneral Troubleshooting Guide for Service Personnel Jaguar Model J-390 SLANT/FIN CORPORATION, Greenvale, N.Y Phone 516