Slant/Fin J-390 installation instructions Zoning with circulators

Page 27

Jaguar Model J-390

 

 

 

27

FROM REST

 

 

 

TO REST

OF SYSTEM

 

 

 

OF SYSTEM

 

 

ADDITIONAL

 

 

 

 

ZONES

 

 

 

 

ISOLATION

 

FLOW CHECK

ZONE

ISOLATION

 

VALVE

 

VALVE

CIRCULATOR

VALVE

 

 

SPACE HEAT

 

 

 

 

 

ZONE #1

 

 

 

 

 

.

AIR VENT

 

 

 

DO NOT EXCEED

 

 

 

 

 

 

 

 

 

12" APART

 

 

AIR SEPARATOR

 

 

 

 

 

PRESSURE

SHUTOFF

 

 

 

 

VALVE

 

 

 

 

REDUCING

 

 

 

 

 

 

 

 

 

VALVE

 

 

 

 

ISOLATION

 

MAKE UP

 

 

 

VALVE

 

 

 

 

 

WATER

 

 

 

 

 

 

 

 

 

 

SUPPLY

PURGE/

ISOLATION

 

 

 

BACK FLOW

VALVE

 

 

 

DRAIN

 

 

 

 

 

 

 

PREVENTOR

VALVE

 

 

 

 

 

 

 

 

(IF REQUIRED)

 

 

 

 

 

 

BOILER LOOP

 

 

 

 

 

CIRCULATOR

 

 

EXPANSION TANK

 

 

(SUPPLIED WITH

 

 

 

 

 

 

(DIAPHRAM TYPE)

 

 

THE BOILER)

 

 

 

 

 

 

 

 

 

 

 

FLOW CHECK

 

 

 

FLOW CHECK

 

VALVE

 

 

 

VALVE

 

 

 

 

 

 

 

 

ISOLATION

T + P

 

 

 

 

VALVE

 

 

 

 

RELIEF

 

 

 

 

 

 

 

 

DHW

 

VALVE

 

 

 

 

 

 

 

 

CIRCULATOR

 

 

 

 

 

RELIEF

 

 

 

 

 

VALVE

 

HOT WATER

 

BOILER WATER

BOILER WATER

 

 

 

OUTLET

 

INLET (RETURN)

 

 

OUTLET (SUPPLY)

 

 

 

 

 

 

 

 

 

 

 

 

DOMESTIC

 

 

 

 

 

HOT WATER

 

 

 

 

 

TANK

 

 

 

 

 

 

SHUTOFF

 

 

 

 

 

VALVE

 

 

 

 

 

COLD

 

 

 

 

 

INLET

 

 

 

 

 

WATER

 

 

 

 

DRAIN VALVE

DRAIN VALVE

Figure 19. Zoning with circulators.

Image 27
Contents Installation and Operating Instructions Jaguar J-390 Boiler Ratings and DimensionsLocation and identification of parts Location and Identification of PartsMinimum Clearances from Combustible Constructions SafetyBoiler Location Boiler FoundationProducts to Avoid NON-DIRECT Vent InstallationDirect Vent Installation Contamination PreventionVent and AIR Intake Materials Flue GAS Venting RequirementsVent and AIR Intake Restrictions PVC/CPVC Pipe General Assembly MethodNON-DIRECT Vent Vertical Venting Venting InstallationSidewall Venting NON-DIRECT Vent Vent Termination Location and Clearances10 MAX Jaguar J-390 NON-DIRECT VENT, Sidewall VentingFT. MIN Jaguar J-390 NON-DIRECT VENT, Venting Through a RoofFT. MIN Thick Wall Jaguar J-390 Direct VENT, Sidewall VentingDIA PVC/CPVC Pipe for Vent Combustion Screw Jaguar Model J-390 FT. MIN Direct Vent Venting and AIR Intake Through a RoofGAS Piping Venting and AIR Intake System Regular InspectionCondensate Removal System Commonwealth of Massachusetts Special RequirementOutdoor AIR Sensor Electrical WiringSpace Heating Thermostats Domestic HOT Water Tank Thermostat101112 Boiler Control 120V 3 4 5 6 7 3 4 5 6 7 Thermostat Water Piping Water Outlet Piping Jaguar Tank PipingFeet w.c Zoning with circulators Zoning with zone valves Piping a heating-cooling system to the boiler and a chiller Before Firing BOILER, make these checks View and Changing TemperaturesViewing and changing system setting Operating Instructions Filling and Venting Water SystemsBoiler Operation Status Jaguar Boiler Display BoardIf outdoor sensor is used Viewing and Changing TemperaturesBoiler model selection, value is 5 for model J-390 Water To Turn OFF GAS to Appliance Safety InformationIII. Initial Start InstructionsJaguar Model J-390 Sequence of Operation IV. Check Combustion and Fuel Input Rate Gas valve adjustmentCheck for gas leaks Safety CheckControl Safety Shutdown test VI. Diagnostic Error Codes19, 42 Going to the sensor, or replace the sensor. If no sen If Replacement Parts are Needed Care and MaintenanceGeneral Maintenance III. CleaningGeneral Troubleshooting Guide for Service Personnel Jaguar Model J-390 SLANT/FIN CORPORATION, Greenvale, N.Y Phone 516