Slant/Fin J-390 installation instructions Ft. Min

Page 11

Jaguar Model J-390

11

 

 

 

JAGUAR J-390 NON - DIRECT VENT, UTILIZING AN EXISTING

CHIMNEY AS A CHASE

All joints must be liquid and pressure tight. Use 4” dia. PVC/CPVC schedule 40 pipe or U/L listed single wall 4" dia.

AL29-4C S.S.*. venting materials (See page 7).

 

90°TERMINATION

* ALTERNATE VERTICAL TERMINATION

ELBOW WITH SCREEN

45°ELBOW

 

* RAIN CAP TERMINATION MAY BE USED

VENT TERMINATION

TEE WITH SCREEN

10 FT. MIN

 

 

CHIMNEY

 

 

TOP PLATE

 

 

1 FT. MIN

 

 

4 INCH DIA. PVC/CPVC

 

 

PIPE OR STAINLESS STEEL

 

 

VENTING MATERIAL FOR

 

SLOPE UP 1/4 IN.

VENT

 

 

 

PER FOOT MIN.

 

90°ELBOW

 

 

AIR INTAKE

 

 

(DO NOT BLOCK)

 

SEAL CHIMNEY OPENING

 

 

 

 

WITH MORTAR OR COVER PLATE

4 INCH DIA. PVC/CPVC

PIPE OR STAINLESS STEEL

VENTING MATERIAL FOR

VENT

Figure 9. Jaguar J-390 - non-direct vent, utilizing an existing chimney as a chase.

* AL 29-4C IS A REGISTERED TRADEMARK OF ALLEGHENY LUDLUM CORP.

Image 11
Contents Installation and Operating Instructions Jaguar J-390 Boiler Ratings and DimensionsLocation and identification of parts Location and Identification of PartsMinimum Clearances from Combustible Constructions SafetyBoiler Location Boiler FoundationProducts to Avoid NON-DIRECT Vent InstallationDirect Vent Installation Contamination PreventionVent and AIR Intake Materials Flue GAS Venting RequirementsVent and AIR Intake Restrictions PVC/CPVC Pipe General Assembly MethodNON-DIRECT Vent Vertical Venting Venting InstallationSidewall Venting NON-DIRECT Vent Vent Termination Location and Clearances10 MAX Jaguar J-390 NON-DIRECT VENT, Sidewall VentingFT. MIN Jaguar J-390 NON-DIRECT VENT, Venting Through a RoofFT. MIN Thick Wall Jaguar J-390 Direct VENT, Sidewall VentingDIA PVC/CPVC Pipe for Vent Combustion Screw Jaguar Model J-390 FT. MIN Direct Vent Venting and AIR Intake Through a RoofGAS Piping Venting and AIR Intake System Regular InspectionCondensate Removal System Commonwealth of Massachusetts Special RequirementOutdoor AIR Sensor Electrical WiringSpace Heating Thermostats Domestic HOT Water Tank Thermostat101112 Boiler Control 120V 3 4 5 6 7 3 4 5 6 7 Thermostat Water Piping Water Outlet Piping Feet w.c JaguarTank Piping Zoning with circulators Zoning with zone valves Piping a heating-cooling system to the boiler and a chiller Before Firing BOILER, make these checks View and Changing TemperaturesViewing and changing system setting Operating Instructions Filling and Venting Water SystemsBoiler Operation Status Jaguar Boiler Display BoardIf outdoor sensor is used Viewing and Changing TemperaturesBoiler model selection, value is 5 for model J-390 Water To Turn OFF GAS to Appliance Safety InformationIII. Initial Start InstructionsJaguar Model J-390 Sequence of Operation IV. Check Combustion and Fuel Input Rate Gas valve adjustmentCheck for gas leaks Safety CheckControl Safety Shutdown test VI. Diagnostic Error Codes19, 42 Going to the sensor, or replace the sensor. If no sen If Replacement Parts are Needed Care and MaintenanceGeneral Maintenance III. CleaningGeneral Troubleshooting Guide for Service Personnel Jaguar Model J-390 SLANT/FIN CORPORATION, Greenvale, N.Y Phone 516