Slant/Fin Jaguar J-390 NON-DIRECT VENT, Venting Through a Roof, Ft. Min

Page 10

10

Jaguar Model J-390

JAGUAR J-390 NON-DIRECT VENT, VENTING THROUGH A ROOF

All joints must be liquid and pressure tight. Use 4” dia. PVC/CPVC schedule 40 pipe or U/L listed single wall 4" dia.

AL29-4C S.S.*. venting materials (See page 7).

 

90°TERMINATION

*ALTERNATE VERTICAL TERMINATION

ELBOW WITH SCREEN

 

45°ELBOW

 

*RAIN CAP TERMINATION MAY BE USED

VENT TERMINATION

TEE WITH SCREEN

10 FT. MIN

1 FT. MIN

FIRESTOP AND

FLASHING AND

SUPPORT

STORM COLLAR

 

 

2" MIN

 

4 IN. DIA. PVC/CPVC

 

PIPE OR STAINLESS STEEL

 

VENTING MATERIAL FOR VENT

SLOPE UP 1/4 IN.

 

PER FOOT MIN.

 

90°ELBOW

FIRESTOP AND

 

SUPPORT

AIR INTAKE

 

(DO NOT BLOCK)

 

 

4 IN. DIA. PVC/CPVC

 

PIPE OR STAINLESS STEEL

 

VENTING MATERIAL FOR VENT

Figure 8. Jaguar J-390 - non-direct vent, venting through the roof

* AL 29-4C IS A REGISTERED TRADEMARK OF ALLEGHENY LUDLUM CORP.

Image 10
Contents Installation and Operating Instructions Ratings and Dimensions Jaguar J-390 BoilerLocation and Identification of Parts Location and identification of partsBoiler Foundation SafetyBoiler Location Minimum Clearances from Combustible ConstructionsContamination Prevention NON-DIRECT Vent InstallationDirect Vent Installation Products to AvoidFlue GAS Venting Requirements Vent and AIR Intake MaterialsPVC/CPVC Pipe General Assembly Method Vent and AIR Intake RestrictionsVent Termination Location and Clearances Venting InstallationSidewall Venting NON-DIRECT Vent NON-DIRECT Vent Vertical VentingJaguar J-390 NON-DIRECT VENT, Sidewall Venting 10 MAXJaguar J-390 NON-DIRECT VENT, Venting Through a Roof FT. MINFT. MIN Jaguar J-390 Direct VENT, Sidewall Venting Thick WallDIA PVC/CPVC Pipe for Vent Combustion Screw Jaguar Model J-390 Direct Vent Venting and AIR Intake Through a Roof FT. MINCommonwealth of Massachusetts Special Requirement Venting and AIR Intake System Regular InspectionCondensate Removal System GAS PipingDomestic HOT Water Tank Thermostat Electrical WiringSpace Heating Thermostats Outdoor AIR Sensor101112 Boiler Control 120V 3 4 5 6 7 3 4 5 6 7 Thermostat Water Piping Water Outlet Piping Tank Piping JaguarFeet w.c Zoning with circulators Zoning with zone valves Piping a heating-cooling system to the boiler and a chiller Operating Instructions Filling and Venting Water Systems View and Changing TemperaturesViewing and changing system setting Before Firing BOILER, make these checksJaguar Boiler Display Board Boiler Operation StatusViewing and Changing Temperatures If outdoor sensor is usedBoiler model selection, value is 5 for model J-390 Water Instructions Safety InformationIII. Initial Start To Turn OFF GAS to ApplianceJaguar Model J-390 Sequence of Operation Gas valve adjustment IV. Check Combustion and Fuel Input RateVI. Diagnostic Error Codes Safety CheckControl Safety Shutdown test Check for gas leaks19, 42 Going to the sensor, or replace the sensor. If no sen III. Cleaning Care and MaintenanceGeneral Maintenance If Replacement Parts are NeededGeneral Troubleshooting Guide for Service Personnel Jaguar Model J-390 SLANT/FIN CORPORATION, Greenvale, N.Y Phone 516