Slant/Fin J-390 installation instructions 3 4 5 6 7

Page 21

MULTIZONING OF "JAGUAR" BOILER;

ZONE VALVE SYSTEM USING V8043E/F ZONE VALVES AND R845A RELAY

 

 

 

 

ZONE 1

 

 

 

 

ZONE 2

 

 

 

 

ZONE 3

 

DISCONNECT

 

 

 

THERMOSTAT

 

 

 

THERMOSTAT

 

 

 

 

THERMOSTAT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SWITCH

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LI

1

V8043E/F

 

 

 

 

V8043E/F

 

 

 

 

V8043E/F

 

 

 

 

 

 

L2

 

 

 

 

 

 

 

 

 

 

 

 

120V/24V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

POWER SUPPLY, PROVIDE DISCONNECT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TRANSFORMER

END

 

TH-TR

 

 

END

 

 

 

 

END

 

 

TH-TR

MOTOR

 

MEANS AND OVERLOAD PROTECTION

SWITCH

MOTOR

SWITCH

TH-TR

MOTOR

SWITCH

 

 

AS REQUIRED.

 

 

 

 

 

T

T

T

T

T

T

T

T

T

T

T

T

 

T

T

T

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SPACE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HEATING

 

 

 

1 2 3 4 5 6 7 8

 

FIELD WIRING

 

 

 

 

 

 

 

 

 

SYSTEM

 

 

 

 

 

 

 

 

TERMINALS

 

 

 

 

 

 

 

 

T

CIRCULATOR

 

 

 

 

 

 

 

 

ON BOILER

 

 

 

 

 

 

 

 

T

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

R845A

 

 

 

JUMPER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RELAY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

2

3

4

5

6

 

 

 

Figure 16a. Multizoning of Jaguar boiler; zone valve system.

Jaguar Model J-390

21

Image 21
Contents Installation and Operating Instructions Jaguar J-390 Boiler Ratings and DimensionsLocation and identification of parts Location and Identification of PartsBoiler Location SafetyBoiler Foundation Minimum Clearances from Combustible ConstructionsDirect Vent Installation NON-DIRECT Vent InstallationContamination Prevention Products to AvoidVent and AIR Intake Materials Flue GAS Venting RequirementsVent and AIR Intake Restrictions PVC/CPVC Pipe General Assembly MethodSidewall Venting NON-DIRECT Vent Venting InstallationVent Termination Location and Clearances NON-DIRECT Vent Vertical Venting10 MAX Jaguar J-390 NON-DIRECT VENT, Sidewall VentingFT. MIN Jaguar J-390 NON-DIRECT VENT, Venting Through a RoofFT. MIN Thick Wall Jaguar J-390 Direct VENT, Sidewall VentingDIA PVC/CPVC Pipe for Vent Combustion Screw Jaguar Model J-390 FT. MIN Direct Vent Venting and AIR Intake Through a RoofCondensate Removal System Venting and AIR Intake System Regular InspectionCommonwealth of Massachusetts Special Requirement GAS PipingSpace Heating Thermostats Electrical WiringDomestic HOT Water Tank Thermostat Outdoor AIR Sensor101112 Boiler Control 120V 3 4 5 6 7 3 4 5 6 7 Thermostat Water Piping Water Outlet Piping Jaguar Tank PipingFeet w.c Zoning with circulators Zoning with zone valves Piping a heating-cooling system to the boiler and a chiller Viewing and changing system setting View and Changing TemperaturesOperating Instructions Filling and Venting Water Systems Before Firing BOILER, make these checksBoiler Operation Status Jaguar Boiler Display BoardIf outdoor sensor is used Viewing and Changing TemperaturesBoiler model selection, value is 5 for model J-390 Water III. Initial Start Safety InformationInstructions To Turn OFF GAS to ApplianceJaguar Model J-390 Sequence of Operation IV. Check Combustion and Fuel Input Rate Gas valve adjustmentControl Safety Shutdown test Safety CheckVI. Diagnostic Error Codes Check for gas leaks19, 42 Going to the sensor, or replace the sensor. If no sen General Maintenance Care and MaintenanceIII. Cleaning If Replacement Parts are NeededGeneral Troubleshooting Guide for Service Personnel Jaguar Model J-390 SLANT/FIN CORPORATION, Greenvale, N.Y Phone 516