Slant/Fin J-390 installation instructions DIA PVC/CPVC Pipe for Vent Combustion Screw

Page 13

Jaguar Model J-390

 

 

13

4" DIA PVC/CPVC PIPE FOR VENT

COMBUSTION

4" DIA PVC/CPVC PIPE

SCREW

VENT

GASES

AIR

FOR AIR INTAKE

 

 

4" DIA PVC/CPVC PIPE FOR VENT

 

 

 

4" DIA PVC/CPVC PIPE FOR AIR INTAKE

 

INSIDE TERMINATION

 

 

PLATE

 

 

 

 

SCREW

 

SEAL HERE

 

WALL

 

 

 

(3" - 14" THICK)

 

 

SCREEN

STOP FOR AIR/VENT

 

WALL

OUTSIDE TERMINAL

 

(3" - 14" THICK)

 

 

 

INSIDE TERMINATION PLATE

LOUVERS

 

 

 

 

 

OUTSIDE TERMINATION PLATE

4" DIA PVC/CPVC COUPLING

OUTSIDE TERMINATION PLATE

SCREEN

 

 

 

 

 

 

4" DIA PVC/CPVC COUPLING

 

4" PVC OR CPVC

 

 

4" PVC OR CPVC

VENT PIPE

 

 

 

 

 

AIR INTAKE PIPE

 

 

 

AIR INTAKE COLLAR

 

 

 

Figure 12a. Vent/Air intake termination; utilizing PVC/CPVC pipe for venting.

4" STAINLESS STEEL VENT PIPE

4" PVC OR CPVC AIR INTAKE PIPE

AIR INTAKE COLLAR

REDUCER RING FOR USE WITH STAINLESS STEEL VENT PIPING

REDUCER RING FOR SLIP JOINT PIPE

SCREW

 

 

4" DIA STAINLESS STEEL SLIP JOINT PIPE FOR VENT

VENT

SCREW

 

GASES

 

 

4" DIA STAINLESS STEEL SLIP JOINT PIPE FOR VENT

 

4" DIA PVC/CPVC PIPE FOR AIR INTAKE

 

WALL

SCREW

 

 

 

(3" - 14" THICK)

 

 

STOP FOR AIR/VENT

OUTSIDE TERMINAL

INSIDE TERMINATION PLATE

OUTSIDE TERMINATION PLATE

REDUCER RING FOR SLIP JOINT PIPE

4" DIA STRAIGHT SCREEN TERMINATION

COMBUSTION

4" DIA PVC/CPVC PIPE

FOR AIR INTAKE

AIR

 

 

INSIDE TERMINATION

 

PLATE

 

SEAL HERE

WALL

(3" - 14" THICK)

LOUVERS

OUTSIDE TERMINATION PLATE

4" DIA STRAIGHT SCREEN TERMINATION

Figure 12b. Vent/Air intake termination; utilizing stainless steel venting materials.

Image 13
Contents Installation and Operating Instructions Jaguar J-390 Boiler Ratings and DimensionsLocation and identification of parts Location and Identification of PartsBoiler Location SafetyBoiler Foundation Minimum Clearances from Combustible ConstructionsDirect Vent Installation NON-DIRECT Vent InstallationContamination Prevention Products to AvoidVent and AIR Intake Materials Flue GAS Venting RequirementsVent and AIR Intake Restrictions PVC/CPVC Pipe General Assembly MethodSidewall Venting NON-DIRECT Vent Venting InstallationVent Termination Location and Clearances NON-DIRECT Vent Vertical Venting10 MAX Jaguar J-390 NON-DIRECT VENT, Sidewall VentingFT. MIN Jaguar J-390 NON-DIRECT VENT, Venting Through a RoofFT. MIN Thick Wall Jaguar J-390 Direct VENT, Sidewall VentingDIA PVC/CPVC Pipe for Vent Combustion Screw Jaguar Model J-390 FT. MIN Direct Vent Venting and AIR Intake Through a RoofCondensate Removal System Venting and AIR Intake System Regular InspectionCommonwealth of Massachusetts Special Requirement GAS PipingSpace Heating Thermostats Electrical WiringDomestic HOT Water Tank Thermostat Outdoor AIR Sensor101112 Boiler Control 120V 3 4 5 6 7 3 4 5 6 7 Thermostat Water Piping Water Outlet Piping Tank Piping JaguarFeet w.c Zoning with circulators Zoning with zone valves Piping a heating-cooling system to the boiler and a chiller Viewing and changing system setting View and Changing TemperaturesOperating Instructions Filling and Venting Water Systems Before Firing BOILER, make these checksBoiler Operation Status Jaguar Boiler Display BoardIf outdoor sensor is used Viewing and Changing TemperaturesBoiler model selection, value is 5 for model J-390 Water III. Initial Start Safety InformationInstructions To Turn OFF GAS to ApplianceJaguar Model J-390 Sequence of Operation IV. Check Combustion and Fuel Input Rate Gas valve adjustmentControl Safety Shutdown test Safety CheckVI. Diagnostic Error Codes Check for gas leaks19, 42 Going to the sensor, or replace the sensor. If no sen General Maintenance Care and MaintenanceIII. Cleaning If Replacement Parts are NeededGeneral Troubleshooting Guide for Service Personnel Jaguar Model J-390 SLANT/FIN CORPORATION, Greenvale, N.Y Phone 516