Olympus M1200 manual Maintenance, Operation Interval

Page 25

3Section

Maintenance

Proper maintenance is required to keep the M1200 operating properly, prevent downtime and to extend the life of your equipment.

WARNING: Disconnect electrical power before performing any service or maintenance inside machine base or before testing or repairing switches or power cords. Failure to do so may result in severe personal injury or death.

OPERATION

INTERVAL

Page #

CLEAN CHEMICAL FEED FILTER & FOOT VALVE

Daily – After Each Job

24

 

 

 

CLEAN VACUUM SHUTOFF ASSEMBLY SCREEN

Daily – After Each Job

24

 

 

 

CLEAN HYDRO-FILTER

Daily – After Each Job

25

 

 

 

RINSE OUT RECOVERY TANK

Daily

25

 

 

 

CLEAN WASTE PUMP-OUT PUMP

Daily

26

 

 

 

FLUSH SOLUTION TANK AND PUMP

Daily

26

 

 

 

CLEAN PUMP-INLET FILTER

Weekly – As needed

27

 

 

 

FLUSH CHEMICAL SYSTEM

Monthly

28

 

 

 

LUBRICATE PRESSURE REGULATOR O-RINGS

Monthly

29

 

 

 

CLEAN DRAIN VALVE

As needed

31

 

 

 

STORAGE PREP – FREEZE PROTECTION

As needed

32

 

 

 

25

Image 25
Contents Revised Table of Contents Introduction M1200 High Pressure Extractor Power Cords 50’ x 12gauge with male & female plug endsPump-out Hose AH79D Additional / Optional EquipmentSafety Page Electrical Cords SET UP and Operation2B. Water Supply & Chemical Dilution Auto-Fill 2A. Water Supply & Chemical Mixing- Manual FillTurquoise Water Supply Priming the High-Pressure Pump Connection of Vacuum Hoses Connection of Solution HoseHose Hook Connection of Pump-out Hose Pressure Adjustment Shutdown Procedures Troubleshooting Olympus M1200 TroubleshootingProblem Cause Solution Problem Cause Solution Pump AP48 M1200 Solution Flow PathWaste Pump Solution Vacuum #2 Vacuum #1 M1200 Wiring DiagramPage Olympus Switch Panel Operation Interval MaintenanceClean Vacuum Shutoff Assembly Screen Clean Chemical Feed Filter & Foot ValveRinse OUT Recovery Tank Clean the HYDRO-FILTERPage Clean Pump Inlet Filter Flush Chemical System Latch Lubricate Pressure Regulator O-RINGSPage Flange Fitting Clean Recovery Tank DrainStorage Prep and Freeze Protection Procedures M1200 Pump AP48 PartsPumptec #356 Pump AP48 Olympus AUTO-FILL Float Valve Assembly Description Page Page Page Page Page Page Limited Warranty