3Section
Maintenance
Proper maintenance is required to keep the M1200 operating properly, prevent downtime and to extend the life of your equipment.
WARNING: Disconnect electrical power before performing any service or maintenance inside machine base or before testing or repairing switches or power cords. Failure to do so may result in severe personal injury or death.
OPERATION | INTERVAL | Page # |
CLEAN CHEMICAL FEED FILTER & FOOT VALVE | Daily – After Each Job | 24 |
|
|
|
CLEAN VACUUM SHUTOFF ASSEMBLY SCREEN | Daily – After Each Job | 24 |
|
|
|
CLEAN | Daily – After Each Job | 25 |
|
|
|
RINSE OUT RECOVERY TANK | Daily | 25 |
|
|
|
CLEAN WASTE | Daily | 26 |
|
|
|
FLUSH SOLUTION TANK AND PUMP | Daily | 26 |
|
|
|
CLEAN | Weekly – As needed | 27 |
|
|
|
FLUSH CHEMICAL SYSTEM | Monthly | 28 |
|
|
|
LUBRICATE PRESSURE REGULATOR | Monthly | 29 |
|
|
|
CLEAN DRAIN VALVE | As needed | 31 |
|
|
|
STORAGE PREP – FREEZE PROTECTION | As needed | 32 |
|
|
|
25