Olympus M1200 manual Introduction

Page 3

Introduction

Congratulations on your purchase of the Hydro-Force Olympus M1200. The M1200 is designed to give truckmount-level performance in a portable machine that combines versatility with ease of transport. Years of experience, engineering, and planning have gone into the design and manufacturing of the M1200. We take a great deal of pride in the M1200; our goal is no less than your complete satisfaction.

This manual will provide users with the knowledge required to operate the Olympus M1200 safely, to understand how to properly operate and maintain the machine, and to ensure that the equipment operates at its maximum performance level.

All users must read and understand this manual completely before operating the machine.

Always maintain this manual in legible condition adjacent to the Olympus M1200, or place in a secure location for future reference.

Any questions pertaining to the operating or servicing of this unit should be directed to your nearest Hydro-Force distributor.

This manual is written specifically for the Olympus M1200 portable extractor units manufactured by:

Hydro-Force

542 W Confluence Ave. Salt Lake City, UT 84123 801-268-2673

801-268-3856 FAX

Information in this manual is subject to change without notice and does not represent a commitment on the part of Hydro-Force or its parent or affiliated companies.

3

Image 3
Contents Revised Table of Contents Introduction Power Cords 50’ x 12gauge with male & female plug ends M1200 High Pressure ExtractorPump-out Hose AH79D Additional / Optional EquipmentSafety Page Electrical Cords SET UP and Operation2B. Water Supply & Chemical Dilution Auto-Fill 2A. Water Supply & Chemical Mixing- Manual FillTurquoise Water Supply Priming the High-Pressure Pump Connection of Vacuum Hoses Connection of Solution HoseHose Hook Connection of Pump-out Hose Pressure Adjustment Shutdown Procedures Troubleshooting Olympus M1200 TroubleshootingProblem Cause Solution Problem Cause Solution Pump AP48 M1200 Solution Flow PathWaste Pump Solution Vacuum #2 Vacuum #1 M1200 Wiring DiagramPage Olympus Switch Panel Operation Interval MaintenanceClean Vacuum Shutoff Assembly Screen Clean Chemical Feed Filter & Foot ValveRinse OUT Recovery Tank Clean the HYDRO-FILTERPage Clean Pump Inlet Filter Flush Chemical System Latch Lubricate Pressure Regulator O-RINGSPage Flange Fitting Clean Recovery Tank DrainStorage Prep and Freeze Protection Procedures M1200 Pump AP48 PartsPumptec #356 Pump AP48 Olympus AUTO-FILL Float Valve Assembly Description Page Page Page Page Page Page Limited Warranty