Quadra-Fire MTVERNINSAE-MBK, MTVERNINSAE-CSB, MTVERNINSAE-PMH Loosen all 6 nuts, but do not Remove

Page 38

Mt. Vernon Pellet Insert (AE)

R

c.Assemble the crevice tool from the micro cleaning kit to attach to a Shop Vac. Figure 38.1.

Figure 38.1

d.Use the crevice tool to fi nish cleaning the heat exchanger

ns. It is critical that the 2 exhaust exits at the back of the

rebox fl oor (left and right) be thoroughly cleaned. Figure 38.2. There are several ways this can done.

1.Use the crevice tool.

2.Attach a hose 1/2 inch (12.7mm) in diameter and approximately 2 feet (607mm in length to your vacuum hose.

3.Use a bottle brush and push the ash down to the bottom. Remove the combustion (exhaust) blower and then vacuum out the ash.

2 exhaust exits (left and right side) must be thoroughly cleaned. Each exit is approximately 4 inches wide, 1 inch across and 3 inches deep.

Figure 38.2

NOTE It is normal to see a certain amount of wear of the heat exchanger fi ns. You may notice some fl aking and pitting on some of the pins. The heat exchanger system will function as designed with as many as 15 of these pins missing.

f. Removing the Combustion (Exhaust) Blower

1.The combustion blower is mounted in the bottom right rear of the appliance. Figure 38.3.

2.Remove side panel and then using an 11/32 nut driver to loosen all six nuts, but do not remove. Rotate the blower and remove from the housing.

Figure 38.4.

3.Set the blower on the fl oor of the appliance. You do not need to disconnect the wires.

4.Vacuum out the exhaust area. Figure 38.5.

Combustion Blower

Figure 38.3

Loosen all 6 nuts, but do NOT Remove

Figure 38.4

Vacuum out the exhaust area.

Figure 38.5

Page 38

7036-135G

November 22, 2011

Image 38
Contents Installation and Operation Hot glass will cause burnsMt. Vernon Pellet Insert AE Label Location On Beaded Chain on e behind Right Side PanelTable of Contents Mobile Home Approved Listing and Code ApprovalsAppliance Certifi cation Glass Specifi cationsAppliance Location Design, Installation & Location ConsiderationsGetting Started Floor SupportPre-Use Check List Tools And Supplies NeededInspect Appliance and Components Thermostat Wall Control Location3Dimensions and Clearances Appliance DimensionsInch Clearance To Exposed Section And Face Trim Built-in Unit Rear Vent with Outside AirFloor Protection Mt. Vernon Pellet Insert AE Built-In VerticalMasonry and Zero Clearance Fireplaces Minimum Opening for Masonry and Zero Clearance FireplacesStarter hole Mark area of floor to cut Mt. Vernon Pellet Insert AE Prefabricated Metal Chimney Altering the Factory-Built FireplaceDo not Terminate Vent 4Vent InformationVenting Termination Minimum Requirements Termination must exhaust above air inlet elevationMt. Vernon Pellet Insert AE Avoiding Smoke and Odors Negative Pressure, Shut-Down and Electrical Power FailureOptional Battery Back-Up Outside AirMt. Vernon Pellet Insert AE Negative Pressure Draft Example of 3 Elbow-Rear Vent Termination Calculation Mt. Vernon Pellet Insert AE Chimney and Exhaust ConnectionEquivalent Feet of Pipe Mt. Vernon Pellet Insert AE Pipe Selection Chart Altitude in Thousands of Feet5Venting Systems Full Reline With Outside Air Horizontal305mm min. above 305mm min. below Never Install in a Sleeping Room 6Mobile HomeOutside Air Kit Instructions 7Appliance Set-UpLeveling System Mt. Vernon Pellet Insert AE Hearth Support Removal of Cast SidesMt. Vernon Pellet Insert AE Surround and Trim Set Cast Surround & Trim Set, BasicRebox. Figures 23.3 Optional Log Set Placement InstructionsRebox. Figures 23.1 7036-135G November 22 Combustible/Non-Combustible Materials Fire Safety8Operating Instructions Fuel Material and Fuel StorageAuto-Clean Firepot System Thermostat Wall Control Automatic SettingThermostat Wall Control Manual Setting General Operating InformationFilling the Hopper with Fuel Fire Characteristics and Flame Height Feed Rate AdjustmentMt. Vernon Pellet Insert AE Before Your First Fire Starting Your First FireMt. Vernon Pellet Insert AE Battery Back-up System Optional Clear SpaceMt. Vernon Pellet Insert AE Ignition Cycles Additional Screen Messages Auto-Clean CycleInsert Removal Wall Control for Reference Or CMt. Vernon Pellet Insert AE Quick Start Guide 74ºF Frequently Asked Questions Issues SolutionsError Message Possible Cause Corrective Action10Maintaining & Servicing Your Appliance Quick Reference Maintenance ChartProper Shutdown Procedure Before Servicing Your ApplianceCleaning Ash Pan General Maintenance and CleaningAuto-Clean System Inspection & Cleaning Ash Removal from FireboxLarge Clinker Cleaning Heat Exchanger, Drop Tube & Exhaust Example of a dirty heat exchangerLoosen all 6 nuts, but do not Remove Door Latch Inspection Cleaning the HopperCleaning the Glass Preparing Firebox for Non-Burn SeasonBaffl e Removal Fire and Smoke RiskGlass Replacement Convection Blower ReplacementConvection Blower Replacement Cont’d Convection Blower ReplacementReference Materials Overheat Sensor Snap Disc Power SupplyThermocouple on Drop Tube Vacuum Switch Thermocouple FirepotFeed Motor, Vacuum Switch, Exhaust Blower, Overheat Sensor Mt. Vernon Pellet Insert AE Component LocationsMt. Vernon Pellet Insert AE Exploded Drawings Part number list on following pagesStocked at Depot Stocked At Depot#38 Feed Assembly 38.5 38.6 38.4 38.3 38.2 38.1 Stocked at Depot #39 Firepot Riser Assembly #40 Auto-Clean Motor/Arm AssemblyStocked At DepotFasteners Accessories SP-MTVS-GDMt. Vernon Pellet Insert AE Mt. Vernon Pellet Insert AE Contact Information