Quadra-Fire MTVERNINSAE-PMH, MTVERNINSAE-CSB Glass Replacement, Convection Blower Replacement

Page 41

R

Mt. Vernon Pellet Insert (AE)

F. Glass Replacement

WARNING

Glass is 5mm thick high temperature heat-re- sistant ceramic glass.

DO NOT REPLACE with any other material.

Alternate material may shatter and cause injury

a.Swing open the face and remove door from the appli- ance by lifting door off of hinge pins and lay on a fl at surface face down.

b.Using a Phillips head screw driver, remove 4 screws 2 on the top and 2 on the bottom. Remove metal bracket and then remove the glass. Figure 41.1.

c.Replace with new glass with gasket.

d.Re-attached metal bracket with 4 screws.

e.Re-install door over hinge pins and close face.

G.Convection Blower Replacement

1.Follow the proper shut down procedures as outlined on page 35, Section 10.A.

Removal of Cast Sides

You will need to remove the cast sides in order to remove and replace the convection blower.

1.There is a latch on the back side of the cast side in the middle of the top opening of the cast side as indicated in Figure 41.2.

2.Place your fi ngers inside the opening and squeeze the latch. The side can now be pulled toward you and removed. Place on a protective surface so as not to damage the fi nish.

3.To replace the side, set the bottom in fi rst. Squeeze the latch in an open position. Place the cast side into posi- tion and then release the latch. The latch hooks onto a bracket to hold the side in place.

Remove 4 screws

Metal Bracket

Glass with Gasket

Figure 41.1

Location of Latch for

Removing Cast Sides

Figure 41.2

Note: Instruction continue on page 42.

November 22, 2011

7036-135G

Page 41

Image 41
Contents Hot glass will cause burns Installation and OperationLabel Location On Beaded Chain on e behind Right Side Panel Mt. Vernon Pellet Insert AETable of Contents Appliance Certifi cation Listing and Code ApprovalsMobile Home Approved Glass Specifi cationsGetting Started Design, Installation & Location ConsiderationsAppliance Location Floor SupportInspect Appliance and Components Tools And Supplies NeededPre-Use Check List Thermostat Wall Control LocationAppliance Dimensions 3Dimensions and ClearancesBuilt-in Unit Rear Vent with Outside Air Inch Clearance To Exposed Section And Face TrimMasonry and Zero Clearance Fireplaces Mt. Vernon Pellet Insert AE Built-In VerticalFloor Protection Minimum Opening for Masonry and Zero Clearance FireplacesStarter hole Mark area of floor to cut Altering the Factory-Built Fireplace Mt. Vernon Pellet Insert AE Prefabricated Metal ChimneyVenting Termination Minimum Requirements 4Vent InformationDo not Terminate Vent Termination must exhaust above air inlet elevationOptional Battery Back-Up Negative Pressure, Shut-Down and Electrical Power FailureMt. Vernon Pellet Insert AE Avoiding Smoke and Odors Outside AirMt. Vernon Pellet Insert AE Negative Pressure Draft Example of 3 Elbow-Rear Vent Termination Calculation Mt. Vernon Pellet Insert AE Chimney and Exhaust ConnectionEquivalent Feet of Pipe Altitude in Thousands of Feet Mt. Vernon Pellet Insert AE Pipe Selection ChartFull Reline With Outside Air Horizontal 5Venting Systems305mm min. above 305mm min. below 6Mobile Home Never Install in a Sleeping RoomOutside Air Kit Instructions 7Appliance Set-UpLeveling System Removal of Cast Sides Mt. Vernon Pellet Insert AE Hearth SupportSurround & Trim Set, Basic Mt. Vernon Pellet Insert AE Surround and Trim Set CastRebox. Figures 23.3 Optional Log Set Placement InstructionsRebox. Figures 23.1 7036-135G November 22 8Operating Instructions Fire SafetyCombustible/Non-Combustible Materials Fuel Material and Fuel StorageThermostat Wall Control Manual Setting Thermostat Wall Control Automatic SettingAuto-Clean Firepot System General Operating InformationMt. Vernon Pellet Insert AE Before Your First Fire Fire Characteristics and Flame Height Feed Rate AdjustmentFilling the Hopper with Fuel Starting Your First FireClear Space Mt. Vernon Pellet Insert AE Battery Back-up System OptionalMt. Vernon Pellet Insert AE Ignition Cycles Additional Screen Messages Auto-Clean CycleInsert Removal Wall Control for Reference Or CMt. Vernon Pellet Insert AE Quick Start Guide 74ºF Issues Solutions Frequently Asked QuestionsPossible Cause Corrective Action Error MessageProper Shutdown Procedure Quick Reference Maintenance Chart10Maintaining & Servicing Your Appliance Before Servicing Your ApplianceAuto-Clean System Inspection & Cleaning General Maintenance and CleaningCleaning Ash Pan Ash Removal from FireboxExample of a dirty heat exchanger Large Clinker Cleaning Heat Exchanger, Drop Tube & ExhaustLoosen all 6 nuts, but do not Remove Cleaning the Glass Cleaning the HopperDoor Latch Inspection Preparing Firebox for Non-Burn SeasonFire and Smoke Risk Baffl e RemovalConvection Blower Replacement Glass ReplacementConvection Blower Replacement Convection Blower Replacement Cont’dReference Materials Thermocouple on Drop Tube Vacuum Switch Power SupplyOverheat Sensor Snap Disc Thermocouple FirepotMt. Vernon Pellet Insert AE Component Locations Feed Motor, Vacuum Switch, Exhaust Blower, Overheat SensorPart number list on following pages Mt. Vernon Pellet Insert AE Exploded DrawingsStocked at Depot At Depot Stocked#38 Feed Assembly 38.5 38.6 38.4 38.3 38.2 38.1 #40 Auto-Clean Motor/Arm Assembly Stocked at Depot #39 Firepot Riser AssemblyAt Depot StockedFasteners SP-MTVS-GD AccessoriesMt. Vernon Pellet Insert AE Mt. Vernon Pellet Insert AE Contact Information