Quadra-Fire MTVERNINSAE-CSB, MTVERNINSAE-PMH, MTVERNINSAE-MBK owner manual 7036-135G November 22

Page 24

Mt. Vernon Pellet Insert (AE)

H. Wall Control Thermostat Installation

1.When mounting the wall control thermostat on the wall, be sure to follow your wall control’s installation instruc- tions carefully.

NOTE: The wall control thermostat should be mounted on an inside wall and not in direct line with the appliance convection air.

NOTE: If the wall control thermostat is located too close to the appliance, you may need to set the temperature setting slightly higher to maintain the desired temperature in your home.

2.There is a 5 screw terminal block located on the back lower left corner of the appliance directly above the power cord inlet.

The center 3 screws are for the wall control thermostat wires and the 2 outer screws are mounting screw and should not have wires attached to them.

The thermostat wires are color coded. The green wire is on the top, the white in the middle and the red on the bottom. Figure 24.1.

There are colored dots corresponding with the same colored wire on the right side which are easily seen by the installer. If by chance it is put in upside down the dots will be on the left side and will not be visible.

CAUTION

Shock hazard.

Do NOT remove grounding prong from plug.

Plug directly into properly grounded 3 prong receptacle.

Route cord away from appliance.

Do NOT route cord under or in front of appliance.

R

12 volt Power Inlet (for optional battery back-up)

Houshold Power Inlet

Green Wire

White Wire

Red Wire

Thermostat Wires in Center 3 Screws

Figure 24.1

Page 24

7036-135G

November 22, 2011

Image 24
Contents Installation and Operation Hot glass will cause burnsMt. Vernon Pellet Insert AE Label Location On Beaded Chain on e behind Right Side PanelTable of Contents Listing and Code Approvals Appliance Certifi cationMobile Home Approved Glass Specifi cationsDesign, Installation & Location Considerations Getting StartedAppliance Location Floor SupportTools And Supplies Needed Inspect Appliance and ComponentsPre-Use Check List Thermostat Wall Control Location3Dimensions and Clearances Appliance DimensionsInch Clearance To Exposed Section And Face Trim Built-in Unit Rear Vent with Outside AirMt. Vernon Pellet Insert AE Built-In Vertical Masonry and Zero Clearance FireplacesFloor Protection Minimum Opening for Masonry and Zero Clearance FireplacesStarter hole Mark area of floor to cut Mt. Vernon Pellet Insert AE Prefabricated Metal Chimney Altering the Factory-Built Fireplace4Vent Information Venting Termination Minimum RequirementsDo not Terminate Vent Termination must exhaust above air inlet elevationNegative Pressure, Shut-Down and Electrical Power Failure Optional Battery Back-UpMt. Vernon Pellet Insert AE Avoiding Smoke and Odors Outside AirMt. Vernon Pellet Insert AE Negative Pressure Draft Mt. Vernon Pellet Insert AE Chimney and Exhaust Connection Equivalent Feet of PipeExample of 3 Elbow-Rear Vent Termination Calculation Mt. Vernon Pellet Insert AE Pipe Selection Chart Altitude in Thousands of Feet5Venting Systems Full Reline With Outside Air Horizontal305mm min. above 305mm min. below Never Install in a Sleeping Room 6Mobile Home7Appliance Set-Up Leveling SystemOutside Air Kit Instructions Mt. Vernon Pellet Insert AE Hearth Support Removal of Cast SidesMt. Vernon Pellet Insert AE Surround and Trim Set Cast Surround & Trim Set, BasicOptional Log Set Placement Instructions Rebox. Figures 23.1Rebox. Figures 23.3 7036-135G November 22 Fire Safety 8Operating InstructionsCombustible/Non-Combustible Materials Fuel Material and Fuel StorageThermostat Wall Control Automatic Setting Thermostat Wall Control Manual SettingAuto-Clean Firepot System General Operating InformationFire Characteristics and Flame Height Feed Rate Adjustment Mt. Vernon Pellet Insert AE Before Your First FireFilling the Hopper with Fuel Starting Your First FireMt. Vernon Pellet Insert AE Battery Back-up System Optional Clear SpaceMt. Vernon Pellet Insert AE Ignition Cycles Auto-Clean Cycle Insert RemovalAdditional Screen Messages Or C Mt. Vernon Pellet Insert AE Quick Start GuideWall Control for Reference 74ºF Frequently Asked Questions Issues SolutionsError Message Possible Cause Corrective ActionQuick Reference Maintenance Chart Proper Shutdown Procedure10Maintaining & Servicing Your Appliance Before Servicing Your ApplianceGeneral Maintenance and Cleaning Auto-Clean System Inspection & CleaningCleaning Ash Pan Ash Removal from FireboxLarge Clinker Cleaning Heat Exchanger, Drop Tube & Exhaust Example of a dirty heat exchangerLoosen all 6 nuts, but do not Remove Cleaning the Hopper Cleaning the GlassDoor Latch Inspection Preparing Firebox for Non-Burn SeasonBaffl e Removal Fire and Smoke RiskGlass Replacement Convection Blower ReplacementConvection Blower Replacement Cont’d Convection Blower ReplacementReference Materials Power Supply Thermocouple on Drop Tube Vacuum SwitchOverheat Sensor Snap Disc Thermocouple FirepotFeed Motor, Vacuum Switch, Exhaust Blower, Overheat Sensor Mt. Vernon Pellet Insert AE Component LocationsMt. Vernon Pellet Insert AE Exploded Drawings Part number list on following pagesStocked at Depot Stocked At Depot#38 Feed Assembly 38.5 38.6 38.4 38.3 38.2 38.1 Stocked at Depot #39 Firepot Riser Assembly #40 Auto-Clean Motor/Arm AssemblyStocked At DepotFasteners Accessories SP-MTVS-GDMt. Vernon Pellet Insert AE Mt. Vernon Pellet Insert AE Contact Information