Quadra-Fire MTVERNINSAE-MBK, MTVERNINSAE-CSB, MTVERNINSAE-PMH Mt. Vernon Pellet Insert AE

Page 54

Mt. Vernon Pellet Insert (AE)

R

Page 54

7036-135G

November 22, 2011

Image 54
Contents Installation and Operation Hot glass will cause burnsMt. Vernon Pellet Insert AE Label Location On Beaded Chain on e behind Right Side PanelTable of Contents Mobile Home Approved Listing and Code ApprovalsAppliance Certifi cation Glass Specifi cationsAppliance Location Design, Installation & Location ConsiderationsGetting Started Floor SupportPre-Use Check List Tools And Supplies NeededInspect Appliance and Components Thermostat Wall Control Location3Dimensions and Clearances Appliance DimensionsInch Clearance To Exposed Section And Face Trim Built-in Unit Rear Vent with Outside AirFloor Protection Mt. Vernon Pellet Insert AE Built-In VerticalMasonry and Zero Clearance Fireplaces Minimum Opening for Masonry and Zero Clearance FireplacesStarter hole Mark area of floor to cut Mt. Vernon Pellet Insert AE Prefabricated Metal Chimney Altering the Factory-Built FireplaceDo not Terminate Vent 4Vent InformationVenting Termination Minimum Requirements Termination must exhaust above air inlet elevationMt. Vernon Pellet Insert AE Avoiding Smoke and Odors Negative Pressure, Shut-Down and Electrical Power FailureOptional Battery Back-Up Outside AirMt. Vernon Pellet Insert AE Negative Pressure Draft Mt. Vernon Pellet Insert AE Chimney and Exhaust Connection Equivalent Feet of PipeExample of 3 Elbow-Rear Vent Termination Calculation Mt. Vernon Pellet Insert AE Pipe Selection Chart Altitude in Thousands of Feet5Venting Systems Full Reline With Outside Air Horizontal305mm min. above 305mm min. below Never Install in a Sleeping Room 6Mobile Home7Appliance Set-Up Leveling SystemOutside Air Kit Instructions Mt. Vernon Pellet Insert AE Hearth Support Removal of Cast SidesMt. Vernon Pellet Insert AE Surround and Trim Set Cast Surround & Trim Set, BasicOptional Log Set Placement Instructions Rebox. Figures 23.1Rebox. Figures 23.3 7036-135G November 22 Combustible/Non-Combustible Materials Fire Safety8Operating Instructions Fuel Material and Fuel StorageAuto-Clean Firepot System Thermostat Wall Control Automatic SettingThermostat Wall Control Manual Setting General Operating InformationFilling the Hopper with Fuel Fire Characteristics and Flame Height Feed Rate AdjustmentMt. Vernon Pellet Insert AE Before Your First Fire Starting Your First FireMt. Vernon Pellet Insert AE Battery Back-up System Optional Clear SpaceMt. Vernon Pellet Insert AE Ignition Cycles Auto-Clean Cycle Insert RemovalAdditional Screen Messages Or C Mt. Vernon Pellet Insert AE Quick Start GuideWall Control for Reference 74ºF Frequently Asked Questions Issues SolutionsError Message Possible Cause Corrective Action10Maintaining & Servicing Your Appliance Quick Reference Maintenance ChartProper Shutdown Procedure Before Servicing Your ApplianceCleaning Ash Pan General Maintenance and CleaningAuto-Clean System Inspection & Cleaning Ash Removal from FireboxLarge Clinker Cleaning Heat Exchanger, Drop Tube & Exhaust Example of a dirty heat exchangerLoosen all 6 nuts, but do not Remove Door Latch Inspection Cleaning the HopperCleaning the Glass Preparing Firebox for Non-Burn SeasonBaffl e Removal Fire and Smoke RiskGlass Replacement Convection Blower ReplacementConvection Blower Replacement Cont’d Convection Blower ReplacementReference Materials Overheat Sensor Snap Disc Power SupplyThermocouple on Drop Tube Vacuum Switch Thermocouple FirepotFeed Motor, Vacuum Switch, Exhaust Blower, Overheat Sensor Mt. Vernon Pellet Insert AE Component LocationsMt. Vernon Pellet Insert AE Exploded Drawings Part number list on following pagesStocked at Depot Stocked At Depot#38 Feed Assembly 38.5 38.6 38.4 38.3 38.2 38.1 Stocked at Depot #39 Firepot Riser Assembly #40 Auto-Clean Motor/Arm AssemblyStocked At DepotFasteners Accessories SP-MTVS-GDMt. Vernon Pellet Insert AE Mt. Vernon Pellet Insert AE Contact Information