Quadra-Fire MTVERNINSAE-CSB, MTVERNINSAE-PMH, MTVERNINSAE-MBK, MTVERNINSAE-CWL owner manual 74ºF

Page 32

Mt. Vernon Pellet Insert (AE)

R

SETTING COMFORT LEVEL

 

READY

 

 

 

 

 

 

12:30 PM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Set at: 68

 

 

71

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MENU

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HEAT OUTPUT

 

 

 

 

 

 

 

 

 

 

 

 

1.Press and hold “UP” or “DOWN” but- ton to set desired temperature.

NOTE: Set temperature must be 3 degrees higher than room temperature for appliance to start.

74ºF

2.Press “HOLD TEMP”.

SET COMFORT LEVEL

74ºF

ON HOLD

DONE RESUME

3.Press “DONE”.

SETTING HEAT OUTPUT

 

READY

 

 

 

 

 

12:30 PM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HoldSet at:

74

 

 

71

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MENU

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HEAT OUTPUT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1.At the starting screen, press “HEAT OUTPUT”.

Medium High

2.Use the “UP” button to change “HEAT OUTPUT LEVEL” to ”MEDIUM-HIGH”.

3.Press “DONE” twice or wait 15 seconds for starting screen to re-appear.

HOPPER OUT OF FUEL

ERROR LIST

Min Firepot Temp

RETRY

SERVICE

1.If the appliance has stopped operat- ing, check the wall control screen. If it is showing “Min Firepot Temp” the hopper has run out of fuel.

2.Fill the hopper with fuel and press the “RETRY” button twice. The fi rst time turns on the back light, the second time starts the retry function.

 

SHUTDOWN

 

12:30 PM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HoldSet at:

74

 

 

71

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MENU

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HEAT OUTPUT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3.If the wall control screen changes to a “SHUTDOWN” screen that means your appliance has not completed the full shutdown cycle. Depending on where it was in the cycle it can take from one to ten minutes to restart.

When the shutdown cycle is complete the wall control screen will display “STARTUP”. Continue to Step 4.

 

STARTUP

 

 

 

 

 

12:30 PM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HoldSet at:

74

 

 

71

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MENU

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HEAT OUTPUT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4.If the wall control screen changes to a “STARTUP” screen after pressing “RETRY” that means your appliance has already completed the shutdown cycle. You must wait until the wall con- trol screen displays the startup screen and then put 1/2 cup of pellets in the fi repot for a quick restart.

5.Be sure the hopper lid and glass door are both closed.

Page 32

7036-135G

November 22, 2011

Image 32
Contents Installation and Operation Hot glass will cause burnsMt. Vernon Pellet Insert AE Label Location On Beaded Chain on e behind Right Side PanelTable of Contents Listing and Code Approvals Appliance Certifi cationMobile Home Approved Glass Specifi cationsDesign, Installation & Location Considerations Getting StartedAppliance Location Floor SupportTools And Supplies Needed Inspect Appliance and ComponentsPre-Use Check List Thermostat Wall Control Location3Dimensions and Clearances Appliance DimensionsInch Clearance To Exposed Section And Face Trim Built-in Unit Rear Vent with Outside AirMt. Vernon Pellet Insert AE Built-In Vertical Masonry and Zero Clearance FireplacesFloor Protection Minimum Opening for Masonry and Zero Clearance FireplacesStarter hole Mark area of floor to cut Mt. Vernon Pellet Insert AE Prefabricated Metal Chimney Altering the Factory-Built Fireplace4Vent Information Venting Termination Minimum RequirementsDo not Terminate Vent Termination must exhaust above air inlet elevationNegative Pressure, Shut-Down and Electrical Power Failure Optional Battery Back-UpMt. Vernon Pellet Insert AE Avoiding Smoke and Odors Outside AirMt. Vernon Pellet Insert AE Negative Pressure Draft Example of 3 Elbow-Rear Vent Termination Calculation Mt. Vernon Pellet Insert AE Chimney and Exhaust ConnectionEquivalent Feet of Pipe Mt. Vernon Pellet Insert AE Pipe Selection Chart Altitude in Thousands of Feet5Venting Systems Full Reline With Outside Air Horizontal305mm min. above 305mm min. below Never Install in a Sleeping Room 6Mobile HomeOutside Air Kit Instructions 7Appliance Set-UpLeveling System Mt. Vernon Pellet Insert AE Hearth Support Removal of Cast SidesMt. Vernon Pellet Insert AE Surround and Trim Set Cast Surround & Trim Set, BasicRebox. Figures 23.3 Optional Log Set Placement InstructionsRebox. Figures 23.1 7036-135G November 22 Fire Safety 8Operating InstructionsCombustible/Non-Combustible Materials Fuel Material and Fuel StorageThermostat Wall Control Automatic Setting Thermostat Wall Control Manual SettingAuto-Clean Firepot System General Operating InformationFire Characteristics and Flame Height Feed Rate Adjustment Mt. Vernon Pellet Insert AE Before Your First FireFilling the Hopper with Fuel Starting Your First FireMt. Vernon Pellet Insert AE Battery Back-up System Optional Clear SpaceMt. Vernon Pellet Insert AE Ignition Cycles Additional Screen Messages Auto-Clean CycleInsert Removal Wall Control for Reference Or CMt. Vernon Pellet Insert AE Quick Start Guide 74ºF Frequently Asked Questions Issues SolutionsError Message Possible Cause Corrective ActionQuick Reference Maintenance Chart Proper Shutdown Procedure10Maintaining & Servicing Your Appliance Before Servicing Your ApplianceGeneral Maintenance and Cleaning Auto-Clean System Inspection & CleaningCleaning Ash Pan Ash Removal from FireboxLarge Clinker Cleaning Heat Exchanger, Drop Tube & Exhaust Example of a dirty heat exchangerLoosen all 6 nuts, but do not Remove Cleaning the Hopper Cleaning the GlassDoor Latch Inspection Preparing Firebox for Non-Burn SeasonBaffl e Removal Fire and Smoke RiskGlass Replacement Convection Blower ReplacementConvection Blower Replacement Cont’d Convection Blower ReplacementReference Materials Power Supply Thermocouple on Drop Tube Vacuum SwitchOverheat Sensor Snap Disc Thermocouple FirepotFeed Motor, Vacuum Switch, Exhaust Blower, Overheat Sensor Mt. Vernon Pellet Insert AE Component LocationsMt. Vernon Pellet Insert AE Exploded Drawings Part number list on following pagesStocked at Depot Stocked At Depot#38 Feed Assembly 38.5 38.6 38.4 38.3 38.2 38.1 Stocked at Depot #39 Firepot Riser Assembly #40 Auto-Clean Motor/Arm AssemblyStocked At DepotFasteners Accessories SP-MTVS-GDMt. Vernon Pellet Insert AE Mt. Vernon Pellet Insert AE Contact Information